Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Peer Reviewed
Format
Subjects
Article Type
Date
Availability
1-20 of 44
Keywords: installation
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
Technology for Offshore Wind Vessels in Ice Conditions
Available to Purchase
Paper presented at the SNAME 29th Offshore Symposium, February 20, 2024
Paper Number: SNAME-TOS-2024-006
... Ice conditions, low air temperatures, and remoteness are affecting the functionality and operations of offshore wind vessels. In addition, cold climates and ice have an impact on the economics of offshore wind installation and maintenance. Vessels without proper ice class have limited...
Proceedings Papers
An innovative Feeder Concept of the Wind Turbine Installation Vessel with Barge Lifting Module
Available to Purchase
Paper presented at the SNAME 29th Offshore Symposium, February 20, 2024
Paper Number: SNAME-TOS-2024-015
... This paper describes the design and third-party assurance process of an innovative feeder concept of the Wind Turbine Installation Vessel (WTIV) with lifting module. An efficient wind turbine installation process is vital to the future rapid development of offshore wind farms in the US. The main...
Proceedings Papers
Missing The Mark -Why We Will Not Meet Our Offshore Renewable Energy Goals and How to Fix it
Available to Purchase
Paper presented at the SNAME 28th Offshore Symposium, March 8, 2023
Paper Number: SNAME-TOS-2023-016
... of fixed and 264GW of floating by 2050 (Ref 1,2), up from only 56GW total now. The problem is the supply chain is not ready to support this. Currently there are only 17 wind turbine installation vessels capable of installing 10MW turbines, and only 3 capable of installing the newest 14 MW turbines...
Proceedings Papers
Role of Classification in the Floating Wind Assurance
Available to Purchase
Paper presented at the SNAME 27th Offshore Symposium, February 22, 2022
Paper Number: SNAME-TOS-2022-006
... By 2050, global installed floating wind capacity is expected to reach 264 GW. Project sanction will require levelized cost of energy (LCOE) being significantly below current levels, but also to demonstrate that the life, property, and the environment are safeguarded. Most class societies were...
Proceedings Papers
Independent Assessment of Current Floater Concepts for Floating Wind Application
Available to Purchase
Paper presented at the SNAME 26th Offshore Symposium, April 6–7, 2021
Paper Number: SNAME-TOS-2021-04
... is to perform an independent qualitative assessment of the current floating wind concepts. The assessment will focus on aspects related to technology readiness, design complexity and scalability, material selection, constructability, installation, operations, and maintenance. This paper provides the offshore...
Proceedings Papers
Offshore Anchoring Systems with Torpedo Piles
Available to Purchase
Paper presented at the SNAME 25th Offshore Symposium, February 27, 2020
Paper Number: SNAME-TOS-2020-006
... the mooring installation. With a very efficient holding capacity, and using the free-fall energy for its own installation, this technology is widely used in Brazil, by Petrobras. It is estimated that more than 2,000 torpedo piles were successfully installed in Brazil's shore. This Kind of Anchor is field...
Proceedings Papers
High Strength and High Stiffness Rope for Permanent Deepwater Mooring: Technology Development and Challenges
Available to Purchase
Paper presented at the SNAME 24th Offshore Symposium, February 20, 2019
Paper Number: SNAME-TOS-2019-005
... stiffness ropes for permanent deepwater moorings. installation fiber rope deepwater upstream oil & gas houston subsea system synthetic fiber rope hmpe rope texas texas section strength application offshore technology conference texas mooring system high strength stiffness polyester...
Proceedings Papers
Challenges of Using Residual Curvature Method in Deep Water Pipelines
Available to Purchase
Paper presented at the SNAME 24th Offshore Symposium, February 20, 2019
Paper Number: SNAME-TOS-2019-002
... and, in some cases, can have unsatisfactory "trigger" reliability for subsea pipelines. The Residual Curvature Method (RCM) is a relatively new and efficient method for LB mitigation and has, to date, been utilized for shallow water pipelines installed by the Reel-lay method. When compared to other lateral...
Proceedings Papers
Design and Installation of Dynamically Installed Piles for Deepwater Mooring
Available to Purchase
Paper presented at the SNAME 24th Offshore Symposium, February 20, 2019
Paper Number: SNAME-TOS-2019-003
... The quest for reliable and cost-effective solution of installing piles in deepwater led to the development of dynamically installed piles that embed themselves into the seabed through free-fall. Several variations of dynamically installed piles have been devised and successfully entered...
Proceedings Papers
Review of Offshore Mooring System Life Extension - Challenges and Recommendations
Available to Purchase
Paper presented at the SNAME 24th Offshore Symposium, February 20, 2019
Paper Number: SNAME-TOS-2019-010
... Mooring systems of many long-term/permanent floating offshore installations (FOIs) are approaching the end of their original design life. Some FOI mooring systems are seeking life extension to support continued production/storage or planned tie-back. Worldwide, many offshore mooring systems have...
Proceedings Papers
Asset Integrity Management - Raising the Bar on Safety
Available to Purchase
Paper presented at the SNAME 23rd Offshore Symposium, February 14, 2018
Paper Number: SNAME-TOS-2018-009
... requirements and current design standards. A brief history of dropped objects in the workplace as they relate to the historical development of safety systems will be discussed and the content of the ABS Guide for the Prevention of Dropped Objects on Offshore Units and Installations will be presented. Working...
Proceedings Papers
Unique Riser Interface Structural Design and Analysis
Available to Purchase
Paper presented at the SNAME 23rd Offshore Symposium, February 14, 2018
Paper Number: SNAME-TOS-2018-010
... structures are integrated into the pontoon ring frames, which provide efficient local structural supports to carry the riser loads. The riser adaptor design is adjusted to the departure angle and azimuth angle for each specific riser. The design enables a safe and easy "drop in" installation of the riser...
Proceedings Papers
Developments in Subsea Tensioning of Mooring Lines
Available to Purchase
Paper presented at the SNAME 23rd Offshore Symposium, February 14, 2018
Paper Number: SNAME-TOS-2018-015
... and more recently developed our own in line tensioner. The idea behind these developments has been to achieve a substantial reduction in deck weight, elimination of the space required and not least significant cost reduction. The focus has also been on reducing the overall installation time by simplifying...
Proceedings Papers
How Classification Societies can be Efficiently Involved in the Current Offshore Industry Cost Reduction Era
Available to Purchase
Paper presented at the SNAME 22nd Offshore Symposium, February 2, 2017
Paper Number: SNAME-TOS-2017-025
... Classification Societies (CS) have accompanied Offshore Oil & Gas industry for decades to guarantee and enhance the safety of their installations through continuous improvement of design codes, standards, rules and methodologies. In today's environment, where the offshore industry business...
Proceedings Papers
Dynamic Performance Analysis of a New Semi Type Offshore Wind Turbine Platform
Available to Purchase
Paper presented at the SNAME 22nd Offshore Symposium, February 2, 2017
Paper Number: SNAME-TOS-2017-015
... A new semi type floating offshore wind turbine platform called Y-Wind is developed to support a 5MW wind turbine, considering various design aspects from engineering through to installation, which can reduce the CAPEX. The platform is designed to achieve the integration of the tower and rotor...
Proceedings Papers
EDP Buoy
Available to Purchase
Paper presented at the SNAME 22nd Offshore Symposium, February 2, 2017
Paper Number: SNAME-TOS-2017-028
... supply vessel and/or Anchor Handling vessel, and self-erect with minimal human intervention. The columns and pontoon of the EDP Buoy are raised for construction and installation. When lowered, the structure behaves like a very stable deep draft semisubmersible. It is suitable for very harsh, but ice free...
Proceedings Papers
Design Challenges of a Hybrid Platform with Multiple Wind Turbines and Wave Energy Converters
Available to Purchase
Paper presented at the SNAME 21st Offshore Symposium, February 16, 2016
Paper Number: SNAME-TOS-2016-025
... depth of 80m to produce power generated from wind and waves. The hybrid system is designed to produce a total of 10MW power from four wind turbines and twenty four wave energy converters (WECs). The platform design is based on industry standards and rules. The wind turbines are installed on four columns...
Proceedings Papers
On the Monitoring of Mooring System Performance
Available to Purchase
Paper presented at the SNAME 21st Offshore Symposium, February 16, 2016
Paper Number: SNAME-TOS-2016-009
... for the performance of mooring systems at a given environmental site and for different types of mooring systems are studied. st offshore symposium line load line angle texas texas section engineer mooring system inspection line failure information naval architect proceedings installation houston...
Proceedings Papers
Integrity Management Services for Floating Units from Design to Decommissioning
Available to Purchase
Paper presented at the SNAME 21st Offshore Symposium, February 16, 2016
Paper Number: SNAME-TOS-2016-031
... when performing engineering analysis. texas texas section materials and corrosion risk and uncertainty assessment risk management flowline corrosion riser corrosion asset integrity houston st offshore symposium consequence installation pipeline corrosion naval architect information...
Proceedings Papers
Class Approach For Life Extension Process Of Floating Production Installations
Available to Purchase
Paper presented at the SNAME 21st Offshore Symposium, February 16, 2016
Paper Number: SNAME-TOS-2016-030
... In the last five years, during the crest of the offshore industry boom, classification societies have received frequent queries on the feasibility of service life extension for different floating production installations (FPIs). Class society ABS initiated research into its records regarding...
1