1-3 of 3
Keywords: caisson
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SNAME 24th Offshore Symposium, February 20, 2019
Paper Number: SNAME-TOS-2019-008
... addressing Class and Flag requirements, (i.e. Class and shelf state regulations that may be a barrier for unmanned operations), risk of entering the unmanned hull, damage tolerance, and damage response capability. caisson simplification h2s management stability ballast tank subsea system...
Proceedings Papers

Paper presented at the SNAME 23rd Offshore Symposium, February 14, 2018
Paper Number: SNAME-TOS-2018-014
... in a scenario where a LNG carrier is moored side by side to a floating or fixed LNG receiving terminal in shallow water. This paper presents a case study of a jetty-moored LNG carrier in the close proximity of a caisson type breakwater structure. The mooring is designed according to the Mooring Equipment...
Proceedings Papers

Paper presented at the SNAME 18th Offshore Symposium, February 7, 2013
Paper Number: SNAME-TOS-2013-003
... system. The generator, transformer, switchgear and controls are mounted at deck level; hence the weight and footprint of the nacelle are greatly reduced. The Advanced Offshore Wind System also employs a tri-pod tower unit and caisson support structure. The vertical-mounted power transmission shaft...

Product(s) added to cart

Close Modal