1-20 of 25
Keywords: installation
Close
Sort by
Proceedings Papers

Paper presented at the SNAME Maritime Convention, September 27–29, 2022
Paper Number: SNAME-SMC-2022-061
... social responsibility ocean energy sustainable development installation sustainability north america government wind energy turbine requirement houston blue economy challenge roger upstream oil & gas contingency planning artificial intelligence subsea system engineering standard...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, October 27–29, 2021
Paper Number: SNAME-SMC-2021-077
... subsea system artificial intelligence fpso platform design sustainability offshore projects planning and execution sustainable development floating production storage & offloading wind energy social responsibility renewable energy engineering application blue economy installation...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, October 27–29, 2021
Paper Number: SNAME-SMC-2021-135
... contribute to the design of such installation and does not establish any realistic project related implications. The project addresses the design of a 15 MW turbine, which represents the upper limit capacity of currently available wind turbines. offshore projects planning and execution artificial...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, October 30–November 1, 2019
Paper Number: SNAME-SMC-2019-005
...Modularity: Facilitator for Commercial Shipyards in Naval Shipbuilding Dr. John C. Daidola1, P.E. (FL) 1AENY Naval Architects and Marine Engineers Modularity in the design and construction of naval vessels is considered wherein modular installations that provide basic ship structure and services...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, October 30–November 1, 2019
Paper Number: SNAME-SMC-2019-044
... With the implementation phase of the 2004 International Convention for the Control of Ships' Ballast Water and Sediments commencing in September, 2019, the need to install ballast water management systems onboard existing vessels has become a critical issue for the marine industry. As ballast...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, October 30–November 1, 2019
Paper Number: SNAME-SMC-2019-077
... progression of the FPS beginning with the Argyll field in the UK Sector of the North Sea in 80 meters of water that was converted from a semisubmersible Mobile Offshore Drilling Unit (MODU) and began producing in 1975. During this period about twenty five FPSs were installed, primarily in the North Sea...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, October 24–28, 2017
Paper Number: SNAME-SMC-2017-037
... expanding the hole while simultaneously installing a bushing. The cold expansion causes a radial plastic flow of material that results in plastic deformation. The material just beyond the plastically deformed hole constrains the plastic region and provides an annular zone of residual compressive stress...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, October 24–28, 2017
Paper Number: SNAME-SMC-2017-048
... Recently, workers constructing an offshore structure have been facing difficulties in identifying the exact locations of the various parts and in examining their interferences during installation because the number of parts is considerably large and they are usually designed to be installed...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, October 24–28, 2017
Paper Number: SNAME-SMC-2017-081
... diagnostic solution optimization ship installation intelligent ship operation artificial intelligence onboard remote diagnostic service monitoring infrastructure maintenance rd system Remote Diagnostic Services As Enablers For Intelligent Shipping Matko Barisic1 (V), Yago Martinez Parrondo1...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, November 1–5, 2016
Paper Number: SNAME-SMC-2016-116
... In this paper, a method is proposed to show 3D design information imposed on a real block using an augmented reality method. Before installing a part, a worker can intuitively understand what to install, how to install parts and where to install them by directly checking out the 3D design...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, November 1–5, 2016
Paper Number: SNAME-SMC-2016-033
... The importance of proper pre-loading of coupling bolts cannot be too strongly stated. Most coupling bolt problems relate to inadequate pre-loading of the bolts during installation, or relaxation of the bolt load in service due to rough or inaccurately machined coupling faces...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, November 1–5, 2016
Paper Number: SNAME-SMC-2016-019
... step approach garbage waste management annual operating cost harbour fee installation total cost A Novel System for Total Environmental Protection Onboard Vessels Valerie Leveille 1 (V), Russell Peters 2 (M), Hadrian Hardings 2 (V), Andrew Korney 1 (V) and Peter Tsantrizos 1 (V) 1. Terragon...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, October 22–24, 2014
Paper Number: SNAME-SMC-2014-OC1
... Oceanographic Institution was the first to opt for an ozone-based Water Quality Assurance system to treat water stored in the ship’s fresh water holding tanks in 1996andwith immediate success of the first installation the rest followed soon thereafter. The most recent installations of the Chem-Free WQA (Water...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, October 22–24, 2014
Paper Number: SNAME-SMC-2014-T53
... marine transportation compliance treatment system smaller vessel uscg regulation requirement uv system ballast tank operation operator upstream oil & gas convention organism ballast water ballast water treatment regulation installation A Small Vessel Guide to Compliance...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, November 8, 2013
Paper Number: SNAME-SMC-2013-S05
... installed 2.3-MW Hywind prototype 26 Figure 10. OC3-Hywind model 27 Figure 11. Principle Power s WindFloat design 29 Figure 12. Rendering of Glosten s PelaStar 31 Figure 13. Components of the PelaStar platform 32 Figure 14. UMaine TLP model dimensioned drawing 33 Figure 15. FWT design concepts featured...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, November 8, 2013
Paper Number: SNAME-SMC-2013-P16
... The architecture, conventionally implemented in marine installations, for the distribution of electrical power is the Radial scheme. In a Radial scheme, power is routed to each consumer directly from a centrally positioned source, such as a switchboard or an MCC. Since the consumers...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, November 8, 2013
Paper Number: SNAME-SMC-2013-P09
... This paper provides insight into the electrical safety by design, installation, and maintenance considerations, specifically as it relates to electrical systems and equipment and the potential consequences if not performed properly. It provides valuable information for the electricians...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, October 24, 2012–October 27, 2021
Paper Number: SNAME-SMC-2012-A24
... a documented procedure for the quantitative assessment and management of hydrocarbon explosion and fire risks in offshore oil and gas facilities. In the present paper, the application of the developed procedure is demonstrated for an FPSO installation with the focus on the definition of explosion and fire...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, October 24, 2012–October 27, 2021
Paper Number: SNAME-SMC-2012-P08
... for layout, production planning, and management of cable installations for electrical power and signals of Navy vessels are extremely complex and time consuming, taking hundreds of thousand man-hours for large naval combatants. Millions of feet of cabling are required to support the advanced and highly...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, November 4–6, 2010
Paper Number: SNAME-SMC-2010-P20
... on the elderly ship viable. The SPS Overlay was installed afloat at the ferry terminal whereas a conventional renewal would have required drydocking the ship. This paper describes the project execution details, the steps involved in applying the SPS Overlay and summarizes the post project impact on the ship’s...

Product(s) added to cart

Close Modal