The paper describes the successful mobilization of the FPSO Munin on the Xijiang field, offshore China, to continue production in the interval that the field’s permanent FPSO was in dry dock for maintenance. The project is unique in that the FPSO Munin relies solely on its Dynamic Positioning (DP) system for station keeping. The paper describes the background to the project and goes into detail on the challenges overcome in order to make it a success. By using the original riser system and by utilizing the FPSO Munin’s DP capability a fast and cost efficient mobilization was achieved that made the project worthwhile for all parties involved. The qualification of the DP system, the offshore installation and the production operation on Xijiang are described in detail. Other applications for DP production are addressed in order to demonstrate the potential of such operations.
Skip Nav Destination
Temporary production at Xijiang field with a DP FPSO Available to Purchase
Hielke Brugts;
Hielke Brugts
Bluewater Energy Services B.V.
Search for other works by this author on:
Mireille Soeters;
Mireille Soeters
Bluewater Energy Services B.V.
Search for other works by this author on:
Max H. Krekel
Max H. Krekel
Bluewater Energy Services B.V.
Search for other works by this author on:
Paper presented at the SNAME Maritime Convention, Houston, Texas, USA, October 2005.
Paper Number:
SNAME-SMC-2005-D49
Published:
October 19 2005
Citation
Brugts, Hielke, Soeters, Mireille, and Max H. Krekel. "Temporary production at Xijiang field with a DP FPSO." Paper presented at the SNAME Maritime Convention, Houston, Texas, USA, October 2005. doi: https://doi.org/10.5957/SMC-2005-D49
Download citation file:
Sign in
Don't already have an account? Register
Personal Account
You could not be signed in. Please check your username and password and try again.
Could not validate captcha. Please try again.
Pay-Per-View Access
$35.00
Advertisement
14
Views
Advertisement
Suggested Reading
Advertisement