1-2 of 2
Keywords: normal operation
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the PSIG Annual Meeting, May 6–9, 2014
Paper Number: PSIG-1406
... determined by the maximum variation expected in the system during normal running as a consequence of changing operations and instrument noise. Leak sensitivity is typically determined by the scale of flow and pressure deviations observed in a leak scenario compared to normal operation. Location...
Proceedings Papers

Paper presented at the PSIG Annual Meeting, May 12–15, 2009
Paper Number: PSIG-09B4
... if the line pressure fell and the differential rate of flow was greater than 2,000 BPD Oil Search performed a leak test on this system in August 1994 with satisfactory results. However, it was accepted that during normal operations of start-up and shutdown, false alarms were experienced. This paper addresses...

Product(s) added to cart

Close Modal