1-7 of 7
Keywords: installation
Close
Sort by
Proceedings Papers

Paper presented at the PSIG Annual Meeting, May 3–7, 2021
Paper Number: PSIG-2117
... to install; therefore, a side-branch installations several miles away from low-speed reciprocating volume or side-branch absorber (SBA) is installed instead. The compressor stations. SBA must be connected to the main piping at a pulsation maximum to be effective. The frequency of attenuation used...
Proceedings Papers

Paper presented at the PSIG Annual Meeting, May 24–27, 2011
Paper Number: PSIG-1106
... SELECTION & LOCATION There are a number of items associated with the route of a pipeline that effect the execution of a system plan. Such items include: Are there any rights of way (R/W) or permit restrictions that would prevent the installation of a pipeline? For example, an existing R/W may restrict...
Proceedings Papers

Paper presented at the PSIG Annual Meeting, May 12–15, 2009
Paper Number: PSIG-09B4
... solution was found to be the most competitively priced, compliant solution. Based on more than 150 installations, its off-the-shelf leak detection functionality was determined to provide the sensitivity, robustness, reliability and accuracy sought after by Oil Search OUT WITH THE OLD Installed in the early...
Proceedings Papers

Paper presented at the PSIG Annual Meeting, October 23–25, 2002
Paper Number: PSIG-0210
... efficiency multiphase pump user roundtable backpressure psia installation upstream oil & gas multiphase pump pressure loss modeling & simulation multiphase presentation application wellhead pressure watercut artificial lift system separation pump performance flowline...
Proceedings Papers

Paper presented at the PSIG Annual Meeting, October 23–25, 1996
Paper Number: PSIG-9610
... accuracy sleipner pressure differential transport network delivery draupner riser platform agreement operation equation installation statoil pipeline operator transport capacity modeling & simulation composition flow rate upstream oil & gas operational condition...
Proceedings Papers

Paper presented at the PSIG Annual Meeting, October 20–21, 1988
Paper Number: PSIG-8807
... and flow. Telemetered measurements are not made primarily for this purpose and therefore are not optimized in their number, scan rate, performance or geographical position to drive a R"h4. NOVA has tested the practical installation of a RT"M on a simple subnetwork of its pipeline system. This installation...
Proceedings Papers

Paper presented at the PSIG Annual Meeting, October 16–17, 1980
Paper Number: PSIG-8005
... consideration nyslsva svxsl zs9 process plant quantity handling upstream oil & gas offshore compressor station nolsnoh installation noilon noilva 13 two-phase flow pipeline slugged liquid hydrocarbon innovative concept svd ABSTRACT As larger quantities of natural gas...

Product(s) added to cart

Close Modal