1-3 of 3
Keywords: distance step
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the PSIG Annual Meeting, May 24–27, 2011
Paper Number: PSIG-1119
... affect that numerical diffusion can in fact be dealt with by appropriate selection of the modeling distance step. Three pipeline conditions are examined: An 8 inch buried gas pipeline with 8 feet of soil between the pipeline and "ambient" temperature. A 24 inch buried gas pipeline with 8 feet...
Proceedings Papers

Paper presented at the PSIG Annual Meeting, October 11–13, 2006
Paper Number: PSIG-0606
... surveillance pipeline simulation interest group production control operator error production monitoring vendor boundary condition check valve distance step simulator configuration error midstream oil & gas real-time model computer delivery Copyright 2006, Pipeline Simulation Interest Group...
Proceedings Papers

Paper presented at the PSIG Annual Meeting, October 17–19, 2001
Paper Number: PSIG-0108
... in time. sss model upstream oil & gas flow rate fluid modeling piping simulation line balance reservoir surveillance piping design pipeline flow model steady-state solution distance step production control real-time model production monitoring equation of state line pack...

Product(s) added to cart

Close Modal