1-17 of 17
Keywords: implementation
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Annual Technical Meeting, June 7–10, 1997
Paper Number: PETSOC-97-14
... Abstract Over the last 20 years many biotechnologies have been proven as a viable means to mitigate the impact of the fossil fuel industry. Recent advances in research have lead to the development and field implementation of innovative treatment technologies such as bioventing, bioslurping...
Proceedings Papers

Paper presented at the Annual Technical Meeting, June 7–10, 1997
Paper Number: PETSOC-97-89
.... Recognizing the increased focus (internationally and domestically) on quality assurance, quality control, continuous improvement and service product standardization Canadian Fracmaster Ltd. has undertaken to implement and registrar in the IS0-9000 program. At the mid-point of1996 it was decided to include...
Proceedings Papers

Paper presented at the Annual Technical Meeting, June 9–11, 1996
Paper Number: PETSOC-96-55
... Abstract The implementation is given for an efficient streamline method that is regularly employed where minimal modeling effort is desired or where the problem is not practical for traditional finite-difference simulation. Two streamline methods are described with full details given for one...
Proceedings Papers

Paper presented at the Annual Technical Meeting, June 6–8, 1995
Paper Number: PETSOC-95-47
... will discuss: Operational considerations associated with the international environment, Design and implementation of the data access and sharing system The areas that were optimized as a result of the data system Recommendations for international operations Introduction With the globalization...
Proceedings Papers

Paper presented at the Annual Technical Meeting, June 11–14, 1994
Paper Number: PETSOC-94-06
... of the project are to characterize the Cypress Sandstone through an integrated geologic and engineering approach; to identify facies-defined waterflood subunits: to design and implement an enhanced oil recovery program utilizing CO 2 ; and to transfer technology to oil and gas operators. Although results from...
Proceedings Papers

Paper presented at the Annual Technical Meeting, May 8–11, 1993
Paper Number: PETSOC-93-68
... reserves, a single well gas flood was implemented to maximize the oil recovery and, at the same time, to minimize the capital investment. However, it is well known that this type of flood is risky, often with premature injected gas breakthrough at the producing interval causing extremely poor or even...
Proceedings Papers

Paper presented at the Annual Technical Meeting, May 8–11, 1993
Paper Number: PETSOC-93-39
... Abstract Many organizations which have implemented Total Quality Management (TQM) are finding that the process has either stalled or is not working as well as originally envisioned. This can be particularly evident in an engineering environment where the uniqueness of engineers...
Proceedings Papers

Paper presented at the Annual Technical Meeting, May 8–11, 1993
Paper Number: PETSOC-93-10
..., and require less information to develop an accurate description. And, major oil companies had the capital to dedicate geologists engineering environment project management technical meeting peace river project reservoir geology annual technical conference implementation reservoir description...
Proceedings Papers

Paper presented at the Annual Technical Meeting, January 1, 1989
Paper Number: PETSOC-89-40-96
... the publication "In Search of Excellence" and the follow-Up publication "A Passion for Excellence". This paper presents the background, implementation, frustrations, successes, and the future of the initiatives undertaken during the last two to three years. Introduction We are all inundated with information...
Proceedings Papers

Paper presented at the Annual Technical Meeting, January 1, 1989
Paper Number: PETSOC-89-40-21
... commitment to the job and to the organization with be increased. Improved emp1oyee productivity and thus enhanced corporate profitability may then be achieved through the implementation of innovative change. This process of improving both personal and corporateerformance has been defined by the author...
Proceedings Papers

Paper presented at the Annual Technical Meeting, June 11–15, 1988
Paper Number: PETSOC-88-39-34
... over a 3 year period between 1981 and 1984. This paper describes the system, how it was implemented and the benefits that were gained as a result. gas processing information upstream oil & gas strategic planning and management midstream oil & gas project management computer...
Proceedings Papers

Paper presented at the Annual Technical Meeting, June 7–10, 1986
Paper Number: PETSOC-86-37-63
... information identifies critical in situ processes; second, such data validates assumptions made under conditions of extreme uncertainty; third, monitoring data can be used to control in situ processes. This paper reviews available methods, implementation, nature and precision of the data expected from...
Proceedings Papers

Paper presented at the Annual Technical Meeting, May 9–12, 1983
Paper Number: PETSOC-83-34-40
... Abstract Production logs play a significant role in the implementation, evaluation and surveillance of enhanced recovery schemes. Maximizing scheme efficiency through the refinement of depletion strategies, improvements on completion effectiveness, and problem well diagnosis is based...
Proceedings Papers

Paper presented at the Annual Technical Meeting, May 2–5, 1981
Paper Number: PETSOC-81-32-43
... immediate implementation of a full-scale recovery project. Therefore, a field pilot test was planned and a pilot location was chosen to be in a prolific part of the West willmar field. Pilot Characteristics The pilot site is 15 ha in area and surrounded by four existing producing wells as shown...
Proceedings Papers

Paper presented at the Annual Technical Meeting, June 12–15, 1978
Paper Number: PETSOC-78-29-20
... fourfold since the system was first implemented. Due to the large volume of data which required annual review, we became concerned both from a manpower and technical viewpoint with our procedure of assessing reserves. We could not expeditiously enter new data or update existing information as it became...
Proceedings Papers

Paper presented at the Annual Technical Meeting, May 7–11, 1973
Paper Number: PETSOC-73-101
... Abstract This paper highlights an integrated scheme of engineering studies implemented in the Heyburn Field since January, 1970 to optimize injection and production operations. The field was discovered in 1955 and waterflood operations initiated in 1964. To minimize declining oil production...

Product(s) added to cart

Close Modal