1-9 of 9
Keywords: construction
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Annual Technical Meeting, June 11–14, 1994
Paper Number: PETSOC-94-08
..., and was operational within two weeks. This method of design and construction provides the benefits of reduced cost, minimized project time, and increased flexibility for component relocation and site abandonment. It is also an alternative method of constructing facilities for remote sites. The battery was built...
Proceedings Papers

Paper presented at the Annual Technical Meeting, April 20–23, 1991
Paper Number: PETSOC-91-108
... have been overcome, and considerable progress has been made towards optimizing operating parameters such as steam slug size. The performance of the single well tests were sufficiently encouraging for the group to begin design and construction of a thirteen well pilot in 1989. Steam injection...
Proceedings Papers

Paper presented at the Annual Technical Meeting, April 20–23, 1991
Paper Number: PETSOC-91-128
... for the construction and behaviour of the dump components, specifically, the containment ribs, the soft clay polder material and the equipment bearing layer. The studies lead to a large scale field test which utilized operations scale equipment. This paper discusses the results from the studies as well...
Proceedings Papers

Paper presented at the Annual Technical Meeting, June 1–4, 1985
Paper Number: PETSOC-85-36-58
... Abstract BP's Wolf Lake Project involves the construction and operation of facilities for the production of bitumen from BP's Marguerite Lake leases. The leases cover an area of 30,000 hectares located about 50 kilometres north of Bonnyville in northeastern Alberta, Canada. The initial...
Proceedings Papers

Paper presented at the Annual Technical Meeting, June 9–12, 1984
Paper Number: PETSOC-84-35-81
... in California, Venezuela and Western Canada. This paper describes some of the factors to be considered in the design, construction and operation of these once-through steam generators. In particular, the design parameters which define the size, shape and ultimate performance of very large steam generators...
Proceedings Papers

Paper presented at the Annual Technical Meeting, June 12–15, 1978
Paper Number: PETSOC-78-29-28
... needs of the province. Quebec and New Brunswick each has one CANDU unit under construction. Only one component of the overall power system, namely long-term waste management, remains to be demonstrated on a commercial scale. Ontario Hydro and Atomic Energy of Canada Ltd. have proposed a comprehensive...
Proceedings Papers

Paper presented at the Annual Technical Meeting, June 12–15, 1978
Paper Number: PETSOC-78-29-09
... Introduction Nuclear energy is an established source of electrical power. Today there are over 260 GW(e) of nuclear electric generating capacity in operation or under construction in the world. Most of this capacity is in the industrialized countries but there is also a significant amount...
Proceedings Papers

Paper presented at the Annual Technical Meeting, May 7–11, 1973
Paper Number: PETSOC-73-107
.... Design and construction of a gas gathering system and dehydration plant to condition production for sale presented varied challenges. The producing wells are quite prolific, with AOF's in excess of 225 MMCFD each. Production characteristics, a combination of daily rates of up to 75 MMCFD per well...
Proceedings Papers

Paper presented at the Annual Technical Meeting, May 15–18, 1972
Paper Number: PETSOC-7259
... Project. Wildlife studies are designed to assess the probable impact of construction and operation of a buried gas pipeline on various species, and to develop means of avoiding or minimizing adverse effects. Direct impacts being studied include possible interference with caribou migrations during...