Introduction
Westcoast Transmission Company Limited has written ad installed a company wide, computer based, Maintenance Control System (MCS). Fort Nelson Gas Plant was used as a pilot and was the first location to completely install the system. The system was justified, designed and installed over a 3 year period between 1981 and 1984. This paper describes the system, how it was implemented and the benefits that were gained as a result.
This content is only available via PDF.
1988. Petroleum Society of Canada
You can access this article if you purchase or spend a download.