1-3 of 3
Keywords: top section
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 1998
Paper Number: OTC-8824-MS
... were developed. At the same time, a preliminary design was developed for the deck and facility. construction predesign study installation balder jacket top section functional requirement otc 8824 mating upstream oil & gas barge design team base section heeremac top section...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 3–6, 1982
Paper Number: OTC-4187-MS
... two interior bents were fabricated in two adjacent sections and separated 650 feet from the design top. A fleet of 24 cranes rolled up one of the 660-foot top sections on its side and set it perpendicular to the ground, lengthwise on the jacket skidway. Welders working 160 feet in the air hung...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 1979
Paper Number: OTC-3493-MS
... installation concept. the lower, or base section, was installed in 1977 and connected to the seafloor with 24 pilings. The middle section was mated to the base section in July of 1978, and the top section placed on the mid section later that same month. Approximately 700 companies played a role...

Product(s) added to cart

Close Modal