1-20 of 199
Keywords: template
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2019
Paper Number: OTC-29561-MS
... the importance of solid preparation in early phase planning, continuous implementation of lessons learned and an extensive test program in order to verify the new technical solutions for the Aasta Hansteen subsea deepwater development. This included development of a new mono-pile "toast rack" template...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2019
Paper Number: OTC-29324-MS
... cost as well. In addition, relevant future R&D task candidates have been identified. leakage reservoir characterization water column injection variation information sounder upstream oil & gas artificial intelligence template geophysical data monitoring scenario sensor gc...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2017
Paper Number: OTC-27588-MS
... upstream oil & gas cable template transformer Gunnar J. , 2016 . Subsea Power Distribution—New Challenges in Subsea Control . PowerPoint Presented at the NFA Subsea , Kristiansand, Norway , 7–8 September . Kleynhans G. , Brenne L. and Kibsgaard S. , 2016...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2016
Paper Number: OTC-27172-MS
... two 5 megawatt wet gas compressors that handle a production rate of 10 million standard cubic metres of gas per day. The compressor system is connected to existing subsea templates and piping 15 kilometres from Gullfaks C. The Åsgard subsea compression system is projected to provide 306 million...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2016
Paper Number: OTC-27201-MS
.... subsea system åsgard qualification template flow line tieback upstream oil & gas offshore technology conference pipeline midgard platform norway subsea processing subsea tieback milestone operation multiphase flow subsea compression compressor statoil installation...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2016
Paper Number: OTC-27273-MS
... training image that was sampled to create a surface map. Then, neural networks algorithm was adopted to train the surface map in order to create the discrete template for pattern generation of 3D Facies distribution along with the 3D Grid Construction. The resulted training image represents a numerical...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2014
Paper Number: OTC-25341-MS
... of technology. Finally, the system as deployed must not be detrimental to or interfere with the existing infrastructure or operations. The area to be monitored was the seabed directly below the production platform, with primary focus around the templates and conductor stacks. Leakage rates to be...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2011
Paper Number: OTC-21346-MS
..., Statoil plans to install the subsea compression system close to two of the subsea production templates at the Gullfaks South field. This will boost the flow of gas towards Gullfaks C, and will both accelerate the total production, increase the total recovery rate and delay or eliminate the need for...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2011
Paper Number: OTC-21680-MS
... performed with use of the construction vessel Seven Seas with various types of structures of extreme weight combined with large outer dimension was performed over campaigns in 2009 and 2010. The Subsea Template Structure was designed to be installed as three modules to reduce the overall weight. The modules...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2009
Paper Number: OTC-20005-MS
... conductors the critical issue was the accuracy of the conductor height for subsequent manifold placement. The solution was to install the respective conductors using a subsea hammer deployed from an Anchor Handling Vessel (AHV). The ALM templates were transported offshore vertically on the AHV s A-frame...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2008
Paper Number: OTC-19218-MS
... associated drilling templates and foundation piles were designed and fabricated. Jacket loadout weights varied between 13,200 te and 16,700 te and the total pile weight, for all six structures, was approximately 44,000 te. Each jacket structure supports operating topsides weights of between 18,000 te and...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 2007
Paper Number: OTC-18963-MS
... will take the technological developments on the Norwegian continental shelf a significant step forward. Project Description The Ormen Lange development is an innovative subsea to shore concept, comprising 24 large bore wells drilled from four subsea templates, with the following key challenges...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 2007
Paper Number: OTC-18965-MS
... fabrication and template installation were awarded between the autumn of 2003 and the summer of 2004. The main part of fabrication and testing took place during 2004/2005 with the subsea templates installed offshore in the late summer of 2005. Umbilical A and remaining subsea equipment were installed during...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 2007
Paper Number: OTC-18961-MS
..., the gas will be exported through Langeled pipeline system, via the Sleipner riser platform in the North Sea, to the UK and continental Europe. pipeline contract transportation system otc 18961 upstream oil & gas template operation project management requirement installation...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2006
Paper Number: OTC-18068-MS
... in the project as an essential element for success. penetration engineering template gulf fabrication compliant tower payload upstream oil & gas interface fatigue analysis interim construction condition installation otc 18068 offshore riser tower base template tbt...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2005
Paper Number: OTC-17109-MS
... start platform oil reserve communication channel technology conference reservoir pressure 37th annual otc troll west drilling operation directional drilling troll east horizontal section template reservoir characterization drillstem/well testing drillstem testing oil column OTC 17109...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2005
Paper Number: OTC-17665-MS
... deposits from the boreholes on subsea production templates are prevented. A Demo 2000 project to qualify the RMR System was therefore approved and a Joint Industry project (JIP) was established funded by the Norwegian Research Counsel, Hydro, Statoil and AGR. The JIP was established to qualify the RMR...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 3–6, 2004
Paper Number: OTC-16688-MS
... Abstract The HPHT field Kristin is located 16 km south west of the Åsgard field in the North Sea. The reservo ir has a temperature of 170°C and a pressure of 911 barg. The field will be produced by pressure depletion from four subsea templates tied back to a dedicated floater. Kristin is the...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 3–6, 2004
Paper Number: OTC-16557-MS
... market. Intial Development to year 2007. The initial development consists of, 2 × 30" pipelines, tee's, PLETs and pig loop for the multiphase production system. It also consists of 2 × 6" pipelines from Nyhamna to Ormen Lange, 6" crossover line between Template A and B for the monoethylene glycol...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 3–6, 2004
Paper Number: OTC-16801-MS
.... Figure 3 shows a closer view of the buckled A-1 leg (NW location). For reference, Figure 4 shows the orientation of the EI-322 'A' complex as well as the leg nomenclature. The B-1 leg almost totally separated from the deck as is shown in Figure 5. strength template hurricane season skirt pile...

Product(s) added to cart

Close Modal