1-20 of 38
Keywords: shipyard
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2020
Paper Number: OTC-30565-MS
... & gas liquified natural gas deflection prelude compressor pmr compressor refrigerant compressor selection offshore check sheet prelude flng generator module turbomachinery gas monetization image courtesy swl pump subsea system lng shipyard base frame courtesy OTC-30565-MS Prelude...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2017
Paper Number: OTC-27813-MS
... and installation are discussed. construction semisubmersible fp riser porch selection upstream oil & gas consideration standardization structural design subsea system riser installation requirement design philosophy shipyard offshore technology conference epci perspective installation...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2016
Paper Number: OTC-26972-MS
... engineering design. Even with the accumulated experience on the design of 12 (twelve) FPSOs conversions, nothing could be compared with 4 (four) ships being simultaneously converted in two shipyards, being one in Brazil and one in China, to receive 4 (four) Process Plants weighting about 35.000 t designed...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2014
Paper Number: OTC-25120-MS
... to be completed by the end of 2014. The concept behind Pieter Schelte is entirely novel, and such is the scale of the ship and her equipment that the building is a major challenge, but one that the shipyard and suppliers are presently coping with well. Proven equipment is used in all elements, but the method...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 2012
Paper Number: OTC-23439-MS
... fpso contractor contractor modec gas injection method floating production system installation jubilee fpso upstream oil & gas ipt strategic planning and management module november 2010 execution project management jurong shipyard completion commissioning and startup subsea system...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2011
Paper Number: OTC-21471-MS
... humidity restrictions, edge-retention and compatibility with water jetting as a replacement to abrasive blasting. The description is based on both laboratory and field data. This paper will help owners and shipyards identify traps posed by underestimating the impact of the blasting & painting...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 3–6, 2010
Paper Number: OTC-20489-MS
... and around the moon pool, and the associated contracting and logistical challenges. drilling operation module azurite project team substructure upstream oil & gas classification society fdpso tensioner requirement fpso shipyard drilling rig moon pool integration drilling equipment...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2009
Paper Number: OTC-20263-MS
... OTC 20263 Conversion of a Fishing Vessel into a 3D Seismic Vessel D.R. Kerr, Halifax Shipyard, and J.J. Berglund Jr., Irving Shipbuilding, Inc. Copyright 2009, Offshore Technology Conference This paper was prepared for presentation at the 2009 Offshore Technology Conference held in Houston, Texas...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2009
Paper Number: OTC-19992-MS
... problems to solve: Lack of capacity of the main vendors, that has been caused by the long period of non-significant activities demanded by the National Offshore area; Yards and shipyards needed to be retrofitted. Many of them where totally closed; Little skilled labor and qualified people...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2008
Paper Number: OTC-19644-MS
... Risk Management Program. risk analysis project risk project management risk management evaluation construction contractor strategic planning and management engineer upstream oil & gas participant artificial intelligence identification procurement prmp shipyard contingency...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 2007
Paper Number: OTC-18859-MS
... certification agency. By having this document available early in the project, it serves as a master reference for bids prepared by designers and shipyards. It is also recommended to have the Project Owner's documents and specifications dealing with the interpretations of the industry standards and any Company...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2005
Paper Number: OTC-17474-MS
... impact on the hull structural design. The engineering process to add current profiling systems to two spars already under construction was completed by the authors and is described in detail in later sections. The structural design and bracket support structure construction work required in the shipyard...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2005
Paper Number: OTC-17361-MS
... construction sanha lpg fpso shipyard fpso upstream oil & gas subsea system offshore chevrontexaco OTC 17361 The Sanha LPG FPSO W. de Ruyter, Single Buoy Moorings Inc.; S. Pellegrino, ChevronTexaco; and H. Cariou, Single Buoy Moorings Inc. Copyright 2005, Offshore Technology Conference This paper...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 3–6, 2004
Paper Number: OTC-16077-MS
... condition liquified natural gas hull lng fsru fabrication operation shipyard comparison study terminal pipeline approx sensitivity vaporizer otc 16077 construction installation tank Copyright 2004, Offshore Technology Conference This paper was prepared for presentation at the Offshore...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 3–6, 2004
Paper Number: OTC-16707-MS
... the execution strategy and sail incomplete from the shipyard and complete work in the more complicated and less favourable environment offshore in Brazil. Within a period of 27 months from the execution of the LOI to the MODEC/FMC organization, the offshore development was producing And the production is being...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 3–6, 2004
Paper Number: OTC-16706-MS
... project execution, FPSO/FSO projects should be carefully planned to be efficient. In order to make this process more efficient, both oil company (owner) and shipyard's (contractor) perspectives must be taken into consideration. The objective of this paper is to provide such an owner and shipyard...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2003
Paper Number: OTC-15231-MS
... on the ship / building structure to resist the pressure). liquified natural gas terminal insulation layer lng vessel shipyard membrane primary membrane flexibility midstream oil & gas otc 15231 prefabricated insulation panel tank containment system inner hull secondary membrane gas...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2002
Paper Number: OTC-13996-MS
... trict specifications imposed on the shipyard or the topsides abricator. At the same time the traditional design pecifications for hull and topsides design may fall short to over the functional needs for FPSO service. Introduction To date, FPSOs have been in operation for several decades. Initially...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2002
Paper Number: OTC-14213-MS
... planned for the newbuild rigs, the main requirements which governed the design were: 10,000ft (3,050m) water depth capability which can handle large variable load and storage capacities; Shipshape unit with dynamic positioning of a size that could be built at most shipyards at a reasonable cost...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2002
Paper Number: OTC-14178-MS
... team was able to utilize the construction efficiencies found in modern shipyards and reduce the overall construction cost of the new generation MOSES TLP. Construction of the Hull The design team reviewed the construction philosophies of past TLP fabrication projects in order to understand...

Product(s) added to cart

Close Modal