Keywords: qualification activity
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35798-MS
... qualification activities required. Based on these studies a comprehensive Technology Qualification Program (TQP) was initiated in 2007. In the period 2007-2014 testing and qualification was carried out in close collaboration with a series of vendors and the EPC contractor from 2011. Nearly 50 activities...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35907-MS
..., and decommissioned in different environments; codes; and supply chains compared to traditional land-based nuclear facilities. Subsequently, the necessary technology qualification activities will be assessed. This methodological approach helps evaluate the risks associated with non-traditional construction...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2022
Paper Number: OTC-31995-MS
... Abstract This paper presents Saipem's qualification activities on its High-Performance version of DEH PiP technology. A reminder of the technology is given as well as an insight into the modifications and improvements performed. Qualification status of the sub-systems specific to the technology...
Proceedings Papers

Paper presented at the Offshore Technology Conference, August 16–19, 2021
Paper Number: OTC-31290-MS
... use and storage qualification plan stability testing subsea system specific gravity subsea processing inhibitor subsea chemical storage solution exposure barrier fluid cylinder deployment sea water operation offshore technology conference qualification activity configuration tank...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2020
Paper Number: OTC-30749-MS
... of the programme. The qualification activities will be completed by the end of 2020. injection system valve application industrialisation chemical unit qualification activity configuration information flowrate subsea processing programme subsea system requirement electrical actuator operation...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2017
Paper Number: OTC-27527-MS
... that are presented in the two widely accepted TQ methodologies. Further, this paper provides insights on how to employ these methodologies to meet specific end user needs. In addition, a case study is included to demonstrate the comparisons between the methodologies. qualification activity us government...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2014
Paper Number: OTC-25409-MS
... qualification process installation control system technology qualification program upstream oil & gas scrubber subsea processing åsgard field qualification activity compressor station transformer power system Presentation of OTC-25409-MS Presentation of OTC-25409-MS References...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 2012
Paper Number: OTC-23118-MS
... qualification process qualification plan qualification qualification activity assessment failure mode requirement hazard operation subsea system new technology failure mechanism artificial intelligence technology qualification argument stakeholder upstream oil & gas technology development...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2008
Paper Number: OTC-19492-MS
... conditions of temperature and possible presence of process fluids. Compared to a topside facility, production forecast analyses have shown that a subsea processing unit has an equivalent potential to preserve high system availability. qualification activity compressor motor modeling...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2006
Paper Number: OTC-17981-MS
... injection pumps with respect to sand handling, testing of valves operated in sand slurry, and qualification of a 36 kV dry mate high voltage connector. FMC Technologies and key partners exectured these qualification activities for the project. Statoil and other suppliers have also carried out other...