1-20 of 265
Keywords: petrobras
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35902-MS
... coefficient source petrobras energy transition platform wind potential fpso pioneiro gross capacity factor oil and ga industry offshore Introduction The supply of energy in the face of growing demand and the control of environmental damage has been a challenge for humanity. Institutions...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35717-MS
... Abstract This paper provides an overview of the application of 4D (Time-Lapse or TL) seismic technology at Petrobras for about a decade, as well as future perspectives. It also shows our current strategy and how it has been fundamental for reservoir monitoring, assisting oil recovery, reducing...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35786-MS
... Abstract This article details the evolution of Petrobras’ project management monitoring and control practices over the last few years, moving from an individual and local control approach to a time of challenges in adopting tools with the use of artificial intelligence. The main challenges...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35587-MS
... contracts as soon as FID milestone was achieved. The project introduced the first high-capacity FPSO of Petrobras (225.000 bpd of oil and 12.000.000 Sm3/d of gas) and novel technologies through its unit e.g. the first leased unit with closed flare concept. Other initiatives seeking for decarbonization...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35624-MS
... Multi-layered flexible pipes have long been important components of PETROBRAS’ subsea production systems. Approximately 14,700 km of these pipes are in service throughout PETROBRAS’ assets in 2024, and more is planned to be laid down in the coming years. Flexible pipe design aims at complying...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35653-MS
... Abstract The purpose of this paper is to present the results of the Petrobras' endeavors in assessing the technical feasibility for the installation of a CO 2 capture plant from exhaust gas generated at the GTGs on a forthcoming Floating Production Storage and Offloading (FPSO) project. In one...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35669-MS
... transfer loss to the subsea environment, is reborn as a competitive option, highlighting the challenges for both new and existing production systems. This paper will address the technical challenges due to specificities of Petrobras, a Brazilian mixed-economy company with rigid processes shaped...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35671-MS
... Abstract The objectives and scope of the proposed paper are to showcase the implementation of downhole electrical systems for intelligent well completion (IWC) and surface-controlled subsurface safety valves (SCSSV), in Petrobras' projects and to present the solutions developed to enable...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35689-MS
... and Rio de Janeiro. It has been producing oil commercially since 1977 and, as of 2023, accounts for 23.43% of Brazil's oil and gas production. The Campos Basin reached its production peak in the 2000s. However later on, Petrobras has concluded that, despite being a mature basin, it still possesses...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35695-MS
...&M) processes remain significant challenges. This paper presents Petrobras' O&M 5.0, a strategic initiative designed to enhance O&M practices by transitioning towards Industry 5.0 to develop innovative solutions and implement them in offshore production units. geologist internet...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35047-MS
... subsea system artificial intelligence offshore technology conference interface displacement configuration generation control new approach monitoring system interchangeability information actuator petrobras application wet christmas tree conversion inertia Introduction The WCT...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35136-MS
...-to-manufacture pipe structures. Over 2000 km of standardized flexible pipes have been procured by Petrobras with these standardization rules, with over 500 km being purchased annually. First, this work presents the historical evolution of flexible pipe standardization by Petrobras up to the current stage...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35293-MS
... optimization. This framework can help owners and stakeholders to align their objectives and priorities for developing and implementing digital avatars, as well as to evaluate their benefits and limitations. digital avatar information management subsea system simulation petrobras artificial...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35323-MS
... on CAPEX, OPEX and enhanced production efficiency. Abstract In the beginning of 2021, Petrobras created its future vision for floating production storage and offloading (FPSO) projects and decided to create a value creation program based in the following aspects: build an interdepartmental effort...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35334-MS
... for the Marlim and Voador fields until 2052, considering the implementation of the life extension and reuse project. The Marlim and Voador Revitalization Project - Modules 1 and 2 - had its Phase 1 approved by Petrobras in July 2015, Phase 2 approved in December 2017, and Phase 3 approved on September 22...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35352-MS
...Introduction First Petrobras pre salt wells were cased, cemented and perforated in a single zone and stimulation strategy was based on a two-step method: first, the bottom of the perforated interval was acid jetted with coiled tubing in order to create a preferential flow area...

Product(s) added to cart

Close Modal