Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-20 of 24
Keywords: mating
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
Integration into the Sandface Tool System for Gravel and Frack-Pack Installations with a Fiber Optics Wet-Mate Connector System
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 5–8, 2014
Paper Number: OTC-25195-MS
... completions, the lower completion contains the screens, and the completion is performed in two stages: the service tool string is run first to perform pack operations, and the second stage "mates" the upper completion string to the lower completion. The unique capabilities of fiber optics sensing techniques...
Proceedings Papers
Improved High Voltage Connection System for Subsea Electrical Submersible Pumps
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 2–5, 2005
Paper Number: OTC-17520-MS
... these, including design details and current qualification status. The major design problem is the wet mate electrical connections located between the X-mas Tree and Tubing Hanger, due to the large size of the connectors. Traditionally they are mounted vertically with the production bore eccentric to the main body...
Proceedings Papers
Spacer Design and Fabrication for Sakhalin II Project
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 3–6, 1999
Paper Number: OTC-10818-MS
... into a drilling and production unit. It is now placed 16 km off the coast of Sakhalin Island as the first production unit in the Russian subarctic. This paper describes the design of the 15,000 tonne Spacer unit, its fabrication in Russia and the mating of the Spacer to the 35,000 tonne modified Molikpaq...
Proceedings Papers
Design and Construction of a Two-Piece Lifted Jack& for the Enchilada Development
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 4–7, 1998
Paper Number: OTC-8824-MS
... platform mating upstream oil & gas water depth barge design team contractor OTC 8824 Design and Construction of a Two-Piece Lifted Jacket for the Enchilada Development Paul L. DorgantiShell Deepwater Development Inc., Mark C. Hansen and G. E. Sgouros/Shell Offshore Inc., Fuat Sezer/Aker Gulf...
Proceedings Papers
The Heidrun Field: Global Structural Design and Analysis of the Heidrun TLP
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 6–9, 1996
Paper Number: OTC-8099-MS
... transversely on barges, and their mating to the hull was unique. The reserve capacity built into the design to provide additional safety in the critical components of the structure. The paper presents an overview of the multitude of challenges encountered during the detail design of the platform...
Proceedings Papers
Mating Of Large Integrated Decks To Concrete Gravity Structures
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 2–5, 1994
Paper Number: OTC-7502-MS
... ABSTRACT In 1993 Norwegian Contractors performed the mating of the topside structures with the Gravity Base Structures for the Draugen and Sleipner A platforms. The mating of the deck is an important milestone in any project for a variety of reasons. The deck but especially the GBS have...
Proceedings Papers
Loadout Of Auger Deck And Hull-Deck Mating Operations
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 2–5, 1994
Paper Number: OTC-7625-MS
... ABSTRACT Loadout of the 24,000 ton Auger deck and the subsequent open ocean joining of the deck to the 20,000 ton floating hull (hereafter referred to as the mating operation), posed interesting technical and operational challenges. The knowledge gained through technical analyses...
Proceedings Papers
Structural Aspects Of Snorre Mating
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 3–6, 1993
Paper Number: OTC-7223-MS
... procedures were required. The mating took place in the autumn with risk of swell. Dynamic analysis of the hull and barge in the mating configuration was performed to decide on the requirement for additional dampers between the column tops and the deck. It was found that friction on the prearranged guides...
Proceedings Papers
ROV Mateable Electrical Connector
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 3–6, 1993
Paper Number: OTC-7290-MS
... comector mating otc 7290 grabber operation vehicle philosophy upstream oil & gas offshore technology conference connector OTC 7290 ROV Mateable Electrical Connector 0.8. Pye, Tronic Ltd. Copyright 1993, Offshore Technology Conference This paper was presented at the 25th Annual OTC...
Proceedings Papers
SISL Project Power Feedthrough Development
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 3–6, 1993
Paper Number: OTC-7289-MS
... conference receptacle shroud tolerance assembly diaphragm motor cable engagement insulation continuity test feedthrough system sisl project power feedthrough development mating upstream oil & gas connector wellhead resistance aTe 7289 SISL Project Power Feedthrough Development JA...
Proceedings Papers
Design and Installation of the North Dauphin Island Platform
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 4–7, 1992
Paper Number: OTC-6955-MS
... were also examined. The structural alternatives which were considered are listed below. In all alternatives the deck would be outfitted with process equipment prior to offshore installation. otc 6955 upstream oil & gas north dauphin island platform mating transport barge receiver shoe...
Proceedings Papers
The Installation Design and Analysis of the Oseberg 'C' Jacket
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 7–10, 1990
Paper Number: OTC-6475-MS
... ABSTRACT. The Oseberg 'C' Jacket utilises for the first time a fully fixed mating system for jacket to template mating. This paper presents a brief review of the available installation options for eight legged barge launched jackets and demonstrates the potential saving for each option...
Proceedings Papers
Prediction of Jacket to Template Docking Forces During Installation
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 1–4, 1989
Paper Number: OTC-5915-MS
... North Sea jackets. This approach usually involves mating of two or more docking sleeves on locating piles adjacent to the template, prior to grounding of the jacket. The accurate prediction of the forces between the piles and sleeves becomes of paramount importance not only in detail structural design...
Proceedings Papers
Offshore Installation Of An Integrated Deck Onto A Preinstalled Jacket
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 5–8, 1986
Paper Number: OTC-5260-MS
... offshore platforms have been well documented. To date however all projects which included the use of an integrated deck were planned on the basis of executing the mating of deck and sub-structure in an inshore sheltered location. This has meant that for the commonest type of sub-structure, namely the steel...
Proceedings Papers
Hutton TLP Marine Operations
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 6–9, 1985
Paper Number: OTC-4910-MS
... ABSTRACT This paper reviews the Planning and execution of the Marine Operations for the Hutton TLP including: Well Template Installation Site Preparation Foundation Installation Temporary Anchorages Mating Major Tows TLP Installation Planning the work to meet project...
Proceedings Papers
The Jacking System and Simulator for Mating the Hutton TLP
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 6–9, 1985
Paper Number: OTC-4948-MS
... ABSTRACT The Hutton TLP Deck/ Hull mating and weldout operation required the use of a sophisticated and unique hydraulic jacking system. The system was designed to accommodate the relative vertical and horizontal motions and the dynamic forces between the Deck and Hull during mating. Obtaining...
Proceedings Papers
The Hutton TLP Deck/Hull Mating Operation
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 6–9, 1985
Paper Number: OTC-4911-MS
... ABSTRACT The deck and hull for the Conoco Hutton Field Tension Leg P1atform were fabricated at separate yards and mated in the Moray Firth, off the east coast of Scotland. Because the Moray Firth mating site is exposed to the North Sea, environmental conditions could be far more severe than...
Proceedings Papers
The Rapid Installation of a Large North Sea Jacket Over a Subsea Template
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 7–9, 1984
Paper Number: OTC-4759-MS
..., and following a trouble free upending was brought over the template and mated with it (Fig. 4). By 7.00 p.m. of the same day the jacket was on-bottom and ballasted for stability. The installation time, from launch to on-bottom stability was under 8 hours. Of this time, less than 2 hours could be attributed...
Proceedings Papers
Hutton TLP Vessel- Structural Configuration and Design Features
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 3–6, 1982
Paper Number: OTC-4427-MS
... procedure for the TLP vessel is outlined and the method used to consider the effect of in-built stresses due to the hull-deck mating operation is described. Limit state design methods and codes were used in the design of the deck, the hull pontoons and the ring stiffened cylindrical columns. A means...
Proceedings Papers
A New Integrated Deck Concept
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 5–8, 1980
Paper Number: OTC-3879-MS
... in the North Sea and details are inc1uded. Methods for accomplishing mating of a HIDECK to a previously installed substructure offshore are presented and potential future applications of the concept are discussed. INTRODUCTION HIDECK, a new integrated deck concept, has been developed during the past three...
1