1-15 of 15
Keywords: loading arm
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2017
Paper Number: OTC-27731-MS
... cycle loading arm lng OTC-27731-MS Comparative Economic and Technical Evaluation of AG FLNG with One vs. Two Trains of Liquefaction Cycles Xuan Chi Nguyen, Ceed de Regt, Komla Mihaeye, Mungyu Kim, Munsung Kim, Donghoon Yoo, Charles Lee, Daniel Lee, Balesh Kumar, and Junghoon Kim, Samsung Heavy...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2015
Paper Number: OTC-25980-MS
... being qualified, Hose Connection Couplers, LNG Loading Arms as well as Vapour Handling System on the LNG Loading Terminal. DP station keeping of the LNG Carrier is performed by the Loading Terminal and this is further described in the paper. The LNG offloading system has been designed so...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2011
Paper Number: OTC-21709-MS
... to offshore receiving terminals with side-by-side Chiksan® loading arms, the cryogenic tandem offshore transfer operations required for export terminals were recognized to be, by far, the most critical link in the whole offshore LNG chain. FMC Technologies Chiksan® Articulated Tandem Offshore Loader (ATOL...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 2007
Paper Number: OTC-19114-MS
... to 18,000m 3 /hour (2 × 5 rigid 16" loading arms) Gas send out capacity of 8 billions cu.m per year (regasification of 45,000m 3 of LNG per day) Water depth: 75m in Gulf of Mexico Therefore, the challenge and the technological objectives are to design a terminal, which: Can berth LNG carriers...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2006
Paper Number: OTC-18026-MS
... operation is governed by many elements, including the performance of the assisting tugs, the general sea state conditions, the mooring line and fender arrangement, the loading arm design and its operational envelope, emergency conditions, LNGC maneuverability, but also tugboat and mooring master competency...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2003
Paper Number: OTC-15301-MS
... been re-gasified, it is brought into the pipeline network to distribute it to the consumers. otc 15301 configuration storage salt cavern exchanger cavern ship connector loading arm offshore technology conference big sweep rigid arm transfer system terminal gas monetization salt...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2002
Paper Number: OTC-14099-MS
... of a central pipe for LNG transfer and a large diameter outer pipe structure also used as the vapor return from the LNG carrier. The LNG carrier can be passivelymoored using gravity restoration by weights located in the horizontal section of the loading arm or DP assisted using both the arm and the LNG carrier...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2002
Paper Number: OTC-14208-MS
.... loading arm buoy operation clamp girassol loading buoy offshore technology conference pipeline assembly station upper line otc 14208 quadruple joint upstream oil & gas fatigue life installation buoyancy module fpso export line OTC 14208 Girassol Export Lines Paul Tricard: SaiBos...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 1983
Paper Number: OTC-4551-MS
... to form a complete unit. In the "combined" system, the production, storage and loading facilities could be contained on. or in. a single structure. ice loading foundation loading loading arm satellite terminal system tanker ice field storage ice condition upstream oil & gas operation...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 1976
Paper Number: OTC-2664-MS
... ABSTRACT In the past, when rubber dock hose was used for cargo transfer, tanker manifold piping and presentation flanges commonly were constructed of cast iron due to its relatively high corrosion resistance. With the advent of all-metal-marine loading arms, the low strength cast iron...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 28–May 1, 1973
Paper Number: OTC-1827-MS
... to calculate stresses in all members of the arm. The analysis can be made with the arm in a variety of attitudes including: stored maneuvering, operating, maintenance, washing, and hydrostatic testing. The following areas are covered: the criticality and complexity of loading arm design, the three-dimensional...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 18–20, 1971
Paper Number: OTC-1334-MS
... Abstract The development of a twenty-four inch diameter marine loading arm is presented in detail. The size of the arm, field servicing techniques and other features all combine to influence its geometric evolution. Illustrations are includedto depict major details. All information pertains...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 18–20, 1971
Paper Number: OTC-1331-MS
... ports of the world as show in Fig. 1.1, while Fig. 1.2 shows expected U.S. crude imports. girder storage roller tanker loading arm upstream oil & gas clearance arrangement bulkhead freight & logistics services requirement terminal cylinder crude reservoir characterization...

Product(s) added to cart

Close Modal