1-10 of 10
Keywords: hard tank
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2019
Paper Number: OTC-29555-MS
... regulations. The platform was made ready with platform mooring chain and topsides installed by floatover in a fjord before being towed vertically to the field. floating production system hard tank spar hull fpso hull condensate tank spar upstream oil & gas subsea system requirement riser...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2015
Paper Number: OTC-26024-MS
..., provided extensive engineering and project management to plan and execute the installation safely. pull tube fabrication soft tank spar hard tank hull riser transport vessel configuration offshore technology conference preparation tank fpso truss spar subsea system mooring system...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 2012
Paper Number: OTC-23461-MS
...; starting below the wavesurface and extending down to the hard tank depth. A concrete Spar concept withreduced waterline diameter has also been developed by Aker Solutions for arcticapplication. This concept had the dual benefit of increasing the natural periodin heave as well as reducing the ice load from...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2009
Paper Number: OTC-19878-MS
... performed offshore. belly strake system spar hull pin installation installation installation aid hull hard tank support pin installation tool stud strake panel fpso tensioner subsea system fabrication configuration requirement otc 19878 floating production system operation...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2005
Paper Number: OTC-17292-MS
... and the U.S. The dry transport of the hard tank from Finland was followed by a unique launch of the truss section and wet mating of the hull prior to wet tow to site. Innovative approaches were required to accomplish these project requirements, while satisfying BP's quality and safety requirements...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2005
Paper Number: OTC-17297-MS
... different fabrication yards. The truss and the soft tank were fabricated on land as one-piece in Technip's GMF yard in South Texas, loaded out and offloaded in sheltered waters next to the fabrication yard using a launch barge (Ref. 1, 2). The hard tank of the hull was built in Technip's TOF yard in Finland...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2003
Paper Number: OTC-15242-MS
.... Roughness can be added to the hard tank of the Spar to minimize scale effects. The paper discusses possible scale effects and the effect of hull roughness on model test results. The repeatability of VIV model tests and reliability of these tests in representing the full-scale situation is discussed...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2002
Paper Number: OTC-14299-MS
..., as a structural link between the upper hard tank and the soft tank at the keel of the platform. The heave plates are integral parts of the truss design, normally consisting of a stiffened plate structure with girders supported by the truss horizontal braces, knee braces and vertical braces. The main function...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2002
Paper Number: OTC-14092-MS
... the topsides. J. Ray McDermott Marine (JRMM) was responsible for the facility installations. otc 14092 subsea system operation barge derrick barge engineering nansen buoyancy hard tank spar platform upstream oil & gas topsides construction tank installation hull mooring system...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 1997
Paper Number: OTC-8384-MS
... was carried out by DOT. neptune project engineering offshore technology conference workshop subsea system lehtinen construction spar hull hull main section subsection otc 8384 upstream oil & gas hard tank mooring system inspection interface fairlead installation OTC 8384...

Product(s) added to cart

Close Modal