1-3 of 3
Keywords: fpso integrity
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2000
Paper Number: OTC-12148-MS
... Abstract Within the framework of the FPSO Integrity JIP, a comparative study of fatigue analysis methods used by the participant Classification Societies (ABS, Bureau Veritas, DNV, Germanischer Lloyd, and Lloyd's Register) is being performed. The objectives of this study are to compare the...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2000
Paper Number: OTC-12143-MS
... Abstract The objective of the Joint Industry project 'FPSO Integrity' is to provide insight in the fatigue loading of FPSO's and the accuracy and validity of computational models. The results should contribute to reliable life time prediction and site assessment studies for this relative new...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2000
Paper Number: OTC-12142-MS
... respect to the load differences, both short term and long term for the two designs. This difference is the driver for the FPSO Integrity Joint Industry Project. The JIP was established to obtain fatigue load information on an FPSO through full-scale measurements. The main goals were as following...

Product(s) added to cart

Close Modal