Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Date
Availability
1-17 of 17
Keywords: design team
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 1–4, 2023
Paper Number: OTC-32202-MS
... 101. Referencing NFPA 101 as part of the design basis document without understanding implications and the background on scope and applicability can lead to inefficiencies in the design of an offshore substation. Design teams unfamiliar with NFPA 101 have struggled to apply means of egress...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 1–4, 2023
Paper Number: OTC-32518-MS
... management separation and treating united states government flow metering sub-sea system strategic planning and management vito project arrangement production profile specification design team ambient air temperature equipment selection functionality reduction recovery unit offshore...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, April 30–May 3, 2018
Paper Number: OTC-28668-MS
... installation and operations vertical deepwater tree development design team high pressure high temperature assembly completion equipment pressure vessel valve upstream oil & gas hanger hpht requirement tree assembly complex reservoir assessment offshore technology conference subsea system...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 1–4, 2017
Paper Number: OTC-27784-MS
... artificial lift system project team procedure upstream oil & gas design team OTC-27784-MS Stampede Multi-Purpose Dynamic Simulator Leonardo Puecher, Chevron; Paul Clare, HESS; Ankur Rastogi, Kongsberg Digital Copyright 2017, Offshore Technology Conference This paper was prepared for presentation...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 2–5, 2016
Paper Number: OTC-26931-MS
... safety integrity, reduce downtime, and increase efficiency. This paper will discuss how employing a HCD process—characterized by the active involvement of users, appropriate allocation of function between users and technology, iteration of design solutions, and a multidisciplinary design team—may result...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 6–9, 2013
Paper Number: OTC-24232-MS
.... Anadarko contracted Technip to perform the analysis and detailed design of these riser systems and, in light of the procurement schedule, the design team was required to refine the riser configuration and sizing early in the design program. This paper describes the strategy and methods employed...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 3–6, 2004
Paper Number: OTC-16700-MS
... of a semisubmersible hull moored in 1936 meters of water supporting four topsides modules. The water depth, the projects flow assurance strategy and an organizational goal to reduce design cycle time and fabrication costs posed numerous challenges to the Hull Global, Structural and Systems Design Teams. This paper...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 6–9, 2002
Paper Number: OTC-14126-MS
... Engineering Design Stress Engineering Services (SES) was part of the Typhoon SCR design team and was responsible for the design analysis including initial sizing and detailed analysis for environmental conditions. The analysis provided design parameters including SCR shapes, extreme and cyclic loads...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, April 30–May 3, 2001
Paper Number: OTC-12998-MS
... between the Operator and the supplier is flawed in some way. There is some uncertainty as to which is the true situation. However, on balance, we feel that information on failure causation may not be reaching the design team and even if it is, it may well not be in a form, which is readily accessible...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 3–6, 1999
Paper Number: OTC-10879-MS
... enhancement application management strategy design team Copyright 1999, Offshore Technology Conference This paper was prepared for presentation at the 1999 Offshore Technology Conference held in Houston, Texas, 3 6 May 1999. This paper was selected for presentation by the OTC Program Committee following...
Proceedings Papers
R.A. Zimmer, R.F. Figgers, J.F. Geesling, H. Kim, D.H. Yeung, Z. Banatwala, G.A. Sidwell, J.A. Stout, B.W. Harris, M.A. van Vugt
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 3–6, 1999
Paper Number: OTC-10755-MS
... for the surrounding fields, it can carry an additional flexibility payload of about 3000 short tons. Introduction The large size and weight of the URSA facilities, production risers and drilling riser presented major challenges for the URSA deck structural design team as well as for the deck and hull fabrication...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 3–6, 1999
Paper Number: OTC-10877-MS
... for quotations (RFQ). Secondly, the project Design Basis Memorandum (DBM) incorporated detailed descriptions of HFE requirements for the design teams. Project Approval. By February 1998, Sable had received full owner and regulatory approval to proceed with the two billion Canadian dollar (approximately 1.35...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 3–6, 1999
Paper Number: OTC-11023-MS
... reinforcement gravity substructure concrete gravity substructure design team OTC 11023 WANDOO CONCRETE GRAVITY SUBSTRUCTURE - ECONOMY THROUGH DESIGN Rob Wallis and Gordon Jackson, Ove Arup & Partners Copyright 1999, Offshore Technology Conference This paper was prepared for presentation at the 1999...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 4–7, 1998
Paper Number: OTC-8824-MS
... Omega, Aker Gulf Marine and Heere Mac. The design approach utilized an integrated design team to develop a new type of design taking advantage of existing contractor equipment and procedures. The design concept included a two-piece lifted jacket that was joined underwater with a grouted connection...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 5–8, 1997
Paper Number: OTC-8574-MS
... kip diameter tieback connector separation interference contact force test fixture connector requirement novel tieback connector high mechanical strength capacity design team preload production facility riser upstream oil & gas lock ring spar subsea wellhead wellhead OTC...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 5–8, 1997
Paper Number: OTC-8362-MS
... time engineer to the design team and charged the engineer with developing and implementing a Hazard Risk Management Program for Mars. This paper reviews that program from initiation to completion and gives recommendations for future similar projects. Risk Management Goals: The first effort...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference, May 6–9, 1996
Paper Number: OTC-8199-MS
... to prevent uncontrolled flow of well fluids when the valve is closed in an emergency, To overcome these difficulties, mechanisms have been developed to allow the pressure above and below the flapper to equalize prior to the complete opening of the flapper. completion equipment design team procedure...