1-1 of 1
Keywords: derrick floor
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 18–20, 1971
Paper Number: OTC-1412-MS
... and pin of the of..the skidway. This was necessary tool joint. The bottom tong served as since the pipe rack was approximately the backup and the top tong as the 4 feet below the derrick floor. The lead or makeup tong. After latching, operator moved a joint of pipe out of an operator performed the makeup...

Product(s) added to cart

Close Modal