1-11 of 11
Keywords: blowout preventer
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2020
Paper Number: OTC-30912-MS
... Abstract A blowout preventer (BOP) is one of the major pressure control safety devices used in the drilling of hydrocarbon wells. Hence, improving BOP reliability and reducing non-productive time has been always a concern to ensure safe and efficient operations. In the last years, multiple...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2015
Paper Number: OTC-26045-MS
... Reliability Joint Industry Project (Phase I - Subsea) ", January 2010 Holand Per , " Reliability of Deepwater Subsea Blowout Preventers ". SINTEF Industrial Management, SPE Drilling and Completions , 2001 Abstract Offshore deepwater drilling is a complex activity requiring the use...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 27–30, 1987
Paper Number: OTC-5578-MS
... the full' completion weight. If this were done one string would receive the full completion weight and fail in tension. These additional safety measures can be achieved with conventional blowout preventers using newly developed dual suspension and sealing rams (Figure 1). These rams are capable...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 1986
Paper Number: OTC-5241-MS
... ABSTRACT: API blowout preventer (and other drill-through equipment) specifications have not been comprehensive and have been lacking in detail. This situation is being corrected in a new publication which is reviewed in this paper. The publication covers annular and ram blowout preventers...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 1976
Paper Number: OTC-2622-MS
.... The ice platforms have successfully supported a drilling rig rated to 6,000 feet, weighing 500 tons and a 15,000 foot rig weighing 845 tons. island upstream oil & gas thickness preventer strength subsea blowout preventer jackson bay ocean floor ice movement ice thickness casing...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 28–May 1, 1973
Paper Number: OTC-1865-MS
... a great future ahead and the fact that almost all the subsea systems being tested or studied at the present time make use of this technique, demonstrates the success anticipated. surface support capsule offshore technology coiilference paper number blowout preventer control panel valve...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 28–May 1, 1973
Paper Number: OTC-1871-MS
... and installation of blowout preventers will be covered. Diver assist operations are documented by 16 mm color underwater photography. Once the blowout preventers have been installed, the problems of normal workovers will be excluded. Three subsea wells were approved as workover candidates. One well did...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 2, 1972
Paper Number: OTC-1710-MS
... will be discussed are those prepared by the United States Geological Survey for the Outer Continental Shelf. Local and State regulations will not be considered. completion equipment engineer well control equipment regulation blowout preventer maximize safety operator ity offshore completion...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 18–20, 1971
Paper Number: OTC-1386-MS
...; difficulties in running tools and drilling assemblies through the ball joint and blowout preventers; damage to the Hydril packing unit from drilling bits and stabilizers; and damage to wellhead seal assemblies during running. At locations where it is common to release the marine riser from the blowout...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 21–23, 1970
Paper Number: OTC-1157-MS
.... Additional practices common to all land drilling operations but critical to well control and blowout prevention are then included to provide safety. drill vessel subsea stack drilling operation preventer procedure reliability riser water depth offshore technology conference 6200 well control...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 17–20, 1969
Paper Number: OTC-1018-MS
... and the economics of timing. well control ocean floor wellhead criteria rig expressway dallas drilling water depth riser system engineer connector pipe upstream oil & gas operation anchor loading wodeco iv blowout preventer riser paper offshore technology conference 6200 OFFSHORE...

Product(s) added to cart

Close Modal