Abstract

This paper presents the solution developed by Petrobras to support oilfield development in Campos and Santos (pre-salt) Basins. This system solution consists of a ship fitted with specialized topside and improved production string design, which together allow for quick XMT installation avoiding slickline or wireline operations, thus completely dismissing drill rigs after production or injection strings.

This content is only available via PDF.
You can access this article if you purchase or spend a download.