The oil industry has faced growing demand for subsea facilities to enable the development of ultra deepwater oil fields. The use of manifold is an alternative widely considered in subsea arrangements. In order to apply this alternative, it is necessary to follow a chain of project that demands special care since its manufacture, installation, commissioning, productive life and possible demobilization, being able to culminate with the removal of equipment from the location. These equipments, sometimes weighing a few hundred tons, require special attention during planning the installation. Thus, this paper proposes to present the challenges faced in the planning and installation of subsea equipments in deepwater, the evolution of the manifold installation techniques at Petrobras, as well as present the main installation methods currently used in Pre-Salt fields and new techniques in development for the installation of large subsea equipments.
Skip Nav Destination
Installation of Manifolds - A Success Story Available to Purchase
Ubirajara Alvarenga de Lima
Ubirajara Alvarenga de Lima
Petrobras
Search for other works by this author on:
Paper presented at the OTC Brasil, Rio de Janeiro, Brazil, October 2017.
Paper Number:
OTC-27967-MS
Published:
October 24 2017
Citation
Costa, Lilson Terra, and Ubirajara Alvarenga de Lima. "Installation of Manifolds - A Success Story." Paper presented at the OTC Brasil, Rio de Janeiro, Brazil, October 2017. doi: https://doi.org/10.4043/27967-MS
Download citation file:
Sign in
Don't already have an account? Register
Personal Account
You could not be signed in. Please check your username and password and try again.
Could not validate captcha. Please try again.
Pay-Per-View Access
$12.00
Advertisement
85
Views
Advertisement
Suggested Reading
Advertisement