Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-3 of 3
Keywords: subsea tree
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference Asia, March 22–25, 2016
Paper Number: OTC-26542-MS
... tankers for shipment of oil and other chemicals. The development of this field also becomes complex because its dependency to an existing facility. installation pipeline flow line shallow water caisson pile upstream oil & gas open box caisson pile subsea tree surface facility scenario...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference Asia, March 22–25, 2016
Paper Number: OTC-26637-MS
... field subsea project: 1.Well Completion System. The weight of subsea tree will be increased as the flow meter is mounted on the tree. The weight increase is contributed not only by the meter, but also by the structure/ frame of the flow meter, counter weight (to maintain the center of gravity...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference-Asia, March 25–28, 2014
Paper Number: OTC-24968-MS
... different methods of fluid displacement to the wells were used during the campaign: Subsea Tree Adapter: For this method an Adapter was fitted to the bottom of the Well Stimulation Tool. Once the WST tool is landed on top of the subsea tree bore, it can be locked in place. The displacement of fluids ino...