Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-4 of 4
Keywords: production packer
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference Asia, March 20–23, 2018
Paper Number: OTC-28616-MS
... producer offshore technology conference perform negative test seal assembly upstream oil & gas mudline packer completion design packer completion equipment completion installation and operations piston force riser gp packer single combo riser production packer OTC-28616-MS A Novel Dual...
Proceedings Papers
Use of Premium Connection to Justify Avoiding Pressure Testing Completion Tubing Prior to Setting Packer. Is this Always Correct?
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference Asia, March 20–23, 2018
Paper Number: OTC-28409-MS
... Abstract Pressure testing completion tubing prior to setting the production packer has been an accepted procedure in the past. However, over the years, complications and time (cost) to run a plug (on slick line) in high angle wells plus the advent of premium tubing connection and use of torque...
Proceedings Papers
Remotely Operated Barrier Valve Provides Interventionless Solution for Offshore Vietnam Completion Campaign
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference Asia, March 22–25, 2016
Paper Number: OTC-26736-MS
... SIMOPS when the wells were flowed for cleanup and later suspended for four months until topsides were commissioned. Two remotely operated barrier valves were pre-installed in their respective nipple profiles (one above the production packer and one below) and run in each of the six completions...
Proceedings Papers
Cement Isolation Packer - An Economic Method of Accessing Bypassed Marginal Reserves in Offshore Brown Field
Available to PurchasePublisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference Asia, March 22–25, 2016
Paper Number: OTC-26691-MS
... of more promising and critical zones below, these sands were not completed and fell above the production packer and behind the production casing. The marginal reserves in these sands did not justify workover operation to complete it. Rigless options were studied and a shut-in well was selected...