Paper presented at the OTC Arctic Technology Conference, November 5–7, 2018
Paper Number: OTC-29165-MS
... way for the construction of the Trans-Alaskan Pipeline System (TAPS). More wells were drilled, and large fields were developed. To date, however, development of discoveries on Alaska's North Slope have been limited to a relatively small area comprising Prudhoe Bay, the Kuparuk Area, small outliers of...
Proceedings Papers

Paper presented at the Arctic Technology Conference, October 24–26, 2016
Paper Number: OTC-27345-MS
... Abstract The design and construction of water-borne craft using "scientific" methods is a relatively recent development in the context of the whole history of humankind, and is by no means universally applied even today. Many traditional craft in current service still rely on the process akin...
Proceedings Papers

Paper presented at the Arctic Technology Conference, October 24–26, 2016
Paper Number: OTC-27438-MS
... major elements: the modular topside facilities, the reinforced concrete gravity base structure (GBS), and crude oil offloading system (OLS). This paper addresses the current engineering and ongoing construction of the Hebron modern iceberg resistant GBS solution. Based on the relevant environmental...
Proceedings Papers

Paper presented at the Arctic Technology Conference, October 24–26, 2016
Paper Number: OTC-27449-MS
... conditions will occur during construction when steep subsea perimeter slopes are possible. Fill placement above the water line integrates a 30-foot setback from the edge of submerged fill to maintain minimum factors of safety and improve constructability. After consolidation and soil strength gain, the...
Proceedings Papers

Paper presented at the Arctic Technology Conference, October 24–26, 2016
Paper Number: OTC-27465-MS
... construction methods rather than reliance on a fleet of marine equipment. ore dock construction crane design-build team ship loader foundation rock fill sheet pile dock sheet pile installation contractor contractor template marine equipment ship loader installation contractor design-bid...
Proceedings Papers

Paper presented at the Arctic Technology Conference, October 24–26, 2016
Paper Number: OTC-27467-MS
... Concrete Spar FPSO platform that has been configured to satisfy all the above requirements and is able to be constructed locally in Eastern Canada. The paper describes a number of key features of the Spar shaped hull, mooring and riser systems that are specifically designed to withstand large iceberg loads...
Proceedings Papers

Paper presented at the Arctic Technology Conference, October 24–26, 2016
Paper Number: OTC-27487-MS
..., Floating LNG (FLNG) or by Gravity Based Structure (GBS) LNG solutions. Onshore developments has been the only alternative developed to date but logistical, foundation and lower productivity for construction, hook up and commissioning in arctic conditions has enabled another development concept to be...
Proceedings Papers

Paper presented at the Arctic Technology Conference, October 24–26, 2016
Paper Number: OTC-27464-MS
... describes the significant design and construction challenges that had to be overcome to successfully complete the Nigliq Channel Bridge. infrastructure construction nigliq channel construction equipment grout project management upstream oil & gas alaska river contractor construction team...
Proceedings Papers

Paper presented at the OTC Arctic Technology Conference, March 23–25, 2015
Paper Number: OTC-25498-MS
... arrangement protects all the vital tanks on board. operation requirement midstream oil & gas offshore technology conference baltic icebreaker lng engine gas monetization contingency planning construction marine diesel oil liquified natural gas propeller propulsion unit baltic sea...
Proceedings Papers

Paper presented at the OTC Arctic Technology Conference, March 23–25, 2015
Paper Number: OTC-25504-MS
... one production well cluster, so careful study of permafrost behavior is needed before and during gas production. Russian experience of gas field development at complicated permafrost (geocryologic) conditions of Yamal peninsula (Kara Sea shore) is presented. construction condensate reservoir...
Proceedings Papers

Paper presented at the OTC Arctic Technology Conference, March 23–25, 2015
Paper Number: OTC-25522-MS
... Abstract In the nearshore zone of the Alaskan Beaufort Sea, three subsea pipeline bundles have been successfully installed by using conventional onshore construction equipment in the winter season operating from a thickened sea ice platform. Differences in water depth, route length and...
Proceedings Papers

Paper presented at the OTC Arctic Technology Conference, February 10–12, 2014
Paper Number: OTC-24576-MS
... Abstract This paper is based on a study for a Barents Sea development with the objective to develop an Arctic deep water platform with the possibility to integrate oil storage that demonstrates the overall functionality of such a concept with regard to HSE, constructability, operability...
Proceedings Papers

Paper presented at the OTC Arctic Technology Conference, February 10–12, 2014
Paper Number: OTC-24578-MS
... cover: Health, Safety and Environmental requirements Functional requirements for production and exploration drilling Regulatory requirements to design and construction execution including limited availability of codes and standards and limited availability of site conditions Site conditions...
Proceedings Papers

Paper presented at the OTC Arctic Technology Conference, February 10–12, 2014
Paper Number: OTC-24559-MS
... each concept has generally served its purpose, there have been many issues both during construction and during operations. This paper reviews the major issues by referring to three specific case histories. Introduction Five general categories of offshore structures incorporating granular material...
Proceedings Papers

Paper presented at the OTC Arctic Technology Conference, February 10–12, 2014
Paper Number: OTC-24560-MS
... lng terminal lng solution arctic region kvaerner operation midstream oil & gas liquified natural gas requirement topside module gas monetization offshore technology conference construction lng availability otc 24560 onshore topsides shallow arctic region john raven...
Proceedings Papers

Paper presented at the OTC Arctic Technology Conference, February 10–12, 2014
Paper Number: OTC-24653-MS
... pipeline artificial intelligence arctic environment jim nash construction offshore technology conference close proximity towed sensor diver power cable cable detection technology otc 24653 conventional method operator pipeline detection method sensor information OTC 24653...
Proceedings Papers

Paper presented at the OTC Arctic Technology Conference, February 10–12, 2014
Paper Number: OTC-24650-MS
... cost of construction and maintenance of pipeline along certain route is determined as a function of several parameters (water depth, presence of ice/icebergs, soil conditions, slop, etc.) and has to be minimized in this model. The problem of optimum pipeline route is solved with the means of modified...
Proceedings Papers

Paper presented at the OTC Arctic Technology Conference, December 3–5, 2012
Paper Number: OTC-23792-MS
... this paper. displacement assembly actuator rubble otc 23792 load cell keel strength test program soil tray resistance ice keel surcharge ceiling soil bed physical testing method ice tank facility berm upstream oil & gas construction test frame OTC 23792 Physical...
Proceedings Papers

Paper presented at the OTC Arctic Technology Conference, December 3–5, 2012
Paper Number: OTC-23719-MS
... platform Prirazlomnayawith a sea-bottom is resulted. Introduction Demand of oil and gas increase requires development of new oil and gasfields leads us to study of them on the sea and ocean shelf. For this reason the actuality of the development of new justified methods ofdesign and construction of...
Proceedings Papers

Paper presented at the OTC Arctic Technology Conference, December 3–5, 2012
Paper Number: OTC-23817-MS
... Abstract Eighteen artificial (man-made) islands have been constructed in the AlaskanBeaufort Sea to support oil exploration and production. The first islands, constructed in the late 1970s, were in shallow nearshore waters where wave andice conditions are relatively benign. By the early 1980s...