1-14 of 14
Keywords: terminal
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the OMC Med Energy Conference and Exhibition, September 28–30, 2021
Paper Number: OMC-2021-046
..., cable connection with the Continent would involve significant costs and wouldn t ensure a back-up solution in case of unexpected interruption in power supply. In this framework, the Hellenic Gas Transmission System Operator (DESFA S.A also owner of the LNG Terminal in Revithousa, has investigated...
Proceedings Papers

Paper presented at the OMC Med Energy Conference and Exhibition, September 28–30, 2021
Paper Number: OMC-2021-155
..., as is the case for the LNG technology regasification terminals. Concerning the need to optimize the loading and unloading plant configuration and the optimization of the loading and unloading operations, a multiscale simulation model of the loading and unloading processes has been developed in the GASVESSEL...
Proceedings Papers

Paper presented at the Offshore Mediterranean Conference and Exhibition, March 27–29, 2019
Paper Number: OMC-2019-1079
... to understand trends and development opportunities for SSLNG and the relationship between them: Appraisal of the main cost factors in the LNG chain. Looking at SSLNG terminals, for instance, some elements of the CAPEX are driven by components that are size-independent like jetty, tanks, utilities...
Proceedings Papers

Paper presented at the Offshore Mediterranean Conference and Exhibition, March 27–29, 2019
Paper Number: OMC-2019-1085
..., accelerometer) have been installed at the pipeline terminals, indicated with ST1 (Station 1 at Kwale flow station, the departing terminal) and ST2 (Station 2 at Akri flow station, the arriving terminal), in Fig. 1. Fig. 1: Kwale-Akri pipeline track location, and vibroacoustic monitoring system scheme. 2 We...
Proceedings Papers

Paper presented at the Offshore Mediterranean Conference and Exhibition, March 20–22, 2013
Paper Number: OMC-2013-142
...1 MONITORING AND INSPECTION ACTIVITIES RELATED TO FACILITY INTEGRITY MANAGEMENT AT ADRIATIC LNG Filippo Belloni, Carlo Mangia, Alessandro Carlesimo, Terminale GNL Adriatico This paper was presented at the 11th Offshore Mediterranean Conference and Exhibition in Ravenna, Italy, March 20-22, 2013...
Proceedings Papers

Paper presented at the Offshore Mediterranean Conference and Exhibition, March 23–25, 2011
Paper Number: OMC-2011-175
... ABSTRACT: The inherent safety perspective is a powerful approach for tackling and communicating the real threats associated to regasification terminals. A set of inherent safety Key Performance Indicators (IS-KPIs) is introduced and demonstrated in current study. The application of integrated...
Proceedings Papers

Paper presented at the Offshore Mediterranean Conference and Exhibition, March 23–25, 2011
Paper Number: OMC-2011-109
... regasification liquefaction pipeline terminal energy consumption raw gas upstream oil & gas italy fugitive emission efficiency co 2 ghg emission consumption combustion This paper was presented at the 10th Offshore Mediterranean Conference and Exhibition in Ravenna, Italy, March 23-25, 2011...
Proceedings Papers

Paper presented at the Offshore Mediterranean Conference and Exhibition, March 23–25, 2011
Paper Number: OMC-2011-121
... dumping) and onshore (temporary air compression stations at both land terminals) and the actual repair operations carried out by a lay vessel. On August, 3th 2009 the repairs were successfully completed and the re-commissioning was carried out such that regular production could re-start 1st October...
Proceedings Papers

Paper presented at the Offshore Mediterranean Conference and Exhibition, March 25–27, 2009
Paper Number: OMC-2009-130
... ABSTRACT: The design of offshore regasification terminals requires measuring against complex issues, related to tasks having reference to the exposed position of the mooring platforms: common operations such as ship handling, mooring and working with loading arms might become challenging...
Proceedings Papers

Paper presented at the Offshore Mediterranean Conference and Exhibition, March 25–27, 2009
Paper Number: OMC-2009-131
... oil refinery, while developing the proposed project of a 4 billion cubic meter of gas per year (BCMY) LNG regasification terminal. In this frame, RINA has been given a contract for carrying out an extensive feasibility analysis, aimed at evaluating the potentials and the limits of the existing...
Proceedings Papers

Paper presented at the Offshore Mediterranean Conference and Exhibition, March 28–30, 2007
Paper Number: OMC-2007-142
... ABSTRACT: It is no secret that new-built onshore LNG receiving terminals are hard to locate because of limited number of sites available, difficult application process and daunting safety constraints compounded by NIMBY reaction of the general public. In order to alleviate some...
Proceedings Papers

Paper presented at the Offshore Mediterranean Conference and Exhibition, March 28–30, 2007
Paper Number: OMC-2007-145
... methodologies, a relatively simple example of which is shortly described, namely the Porto Empedocle LNG terminal carried out to support the terminal basic design. The model developed represents the logistic chain from the overseas loading terminals to the gas delivery to the network. The results...
Proceedings Papers

Paper presented at the Offshore Mediterranean Conference and Exhibition, March 28–30, 2001
Paper Number: OMC-2001-101
... of the tool anywhere in a pipeline, through the transmission of commands and the reception of pipeline and operational data through the pipe-wall. isolation system terminal plug module replacement communication system operator module platform packer valve pipeline pipeline pigging midstream...

Product(s) added to cart

Close Modal