Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-5 of 5
Keywords: surface facility
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Key High-Level Insights into the Long-Term Shut-In Due to Force Majeure on Assets, Consequences and Benefits. Field Cases Studies
Available to PurchasePublisher: Offshore Mediterranean Conference
Paper presented at the OMC Med Energy Conference and Exhibition, April 8, 2025
Paper Number: OMC-2025-629
... of the shut-in period, the type of reservoir, and the condition of the well equipment. In general, the procedure of restarting a long-term shut-in oil well involves several steps and considerations: - Surface facilities perspective, potentially devastating, subjected to corrosion, and destroyed. - Wellbore...
Proceedings Papers
Tempa Rossa Project - Construction Activities
Available to PurchasePublisher: Offshore Mediterranean Conference
Paper presented at the Offshore Mediterranean Conference and Exhibition, March 29–31, 2017
Paper Number: OMC-2017-822
... are: - Eight producing wells, - Site preparation for the construction of surface facilities and access roads, - Surface facilities for oil and gas treatment - Pipelines, flowlines, electrical and control cables between the surface facilities and the wells. The construction phase of the project presents many...
Proceedings Papers
Surface Facilities of the Tempa Rossa Project
Available to PurchasePublisher: Offshore Mediterranean Conference
Paper presented at the Offshore Mediterranean Conference and Exhibition, March 29–31, 2017
Paper Number: OMC-2017-827
... infrastructure is limited in relation to the extent of the works to be executed and the construction schedule. The Ready for Oil Production Date of the Project is scheduled for the 31st December 2017. Introduction The Surface Facilities consists of various plants located in different areas: Oil Centre...
Proceedings Papers
Integrated Production Optimization Through Model-Based Decision Support and Advanced Optimization Techniques
Available to PurchasePublisher: Offshore Mediterranean Conference
Paper presented at the Offshore Mediterranean Conference and Exhibition, March 20–22, 2013
Paper Number: OMC-2013-123
.... In the gathering facilities and process plant engineering design, the optimization is driven by inputs that are subjected, during the asset life, to changes; this fact, coupled to improvements and modifications in surface facilities, creates the necessity to manage and optimize production scenarios with a more...
Proceedings Papers
Surface Facilities For Shale Gas: A Matter Of Modularity, Phasing And Minimal Operations
Available to PurchasePublisher: Offshore Mediterranean Conference
Paper presented at the Offshore Mediterranean Conference and Exhibition, March 23–25, 2011
Paper Number: OMC-2011-158
... of key concepts: multidisciplinary integration, gradual expansion, wells tie-in phasing optimization, modularity, design to cost, standardization, supply chain efficiency, operative experience. On this basis eni is approaching the surface facilities design and engineering in two phases. The first one...