ABSTRACT:
Some useful lessons related to environmental aspects have been learned from the design, construction and operation of the Intersinai Gas Pipeline. The line goes from El-Gamil gas plant southwards alongside Suez Canal then crosses the Suez Canal to the East bank up to El-Arish coastal area approximately 235 Km. long. The major environmental issues considered in this paper are:
- ·
Physical environmental aspects
- ·
Socio-economic aspects
- ·
Environmental and Project aspects
- ·
Alternative of the routes.
This content is only available via PDF.
2001. Offshore Mediterranean Conference
You can access this article if you purchase or spend a download.