ABSTRACT:

The Western Libyan Gas Project (WLGP) is a major development entailing the develpment of two reservoirs. This paper addresses the challenges that this WLGP facility development posed in terms of developing and managing the HEalth, Safety, Environment, and Quality (HSEQ) system from concept though development to production phases. This had to be achieved agianst a background of a complex contractual basis, and the need to ensure that the complexity was managed in such a way that final documents and data, and all other information required to operate, maintain, and modify the facilities was compatible with the eventual Company HSEQ-IMS.

This content is only available via PDF.
You can access this article if you purchase or spend a download.