ABSTRACT:

The Girassol field, offshore Angola, is the largest deepwater subsea development ever brought into production. This development has been marked by three key dates: discovery (April 1996), sanction (July 1998) and first oil (December 2001). This paper gives a general description of the Girassol development, outlines the main challenges faced during the project phase, and explain how the subsurface uncertainties have been managed throughout the project.

This content is only available via PDF.
You can access this article if you purchase or spend a download.