J Ship Prod Des (2022)
Paper Number: SNAME-JSPD-05200014
Published: 29 June 2022
...Namsu Ahn; Soochan Kim In shipbuilding industry, to reduce the staying time of the ship in a dock, floating crane and floating dock are used to handle the mega-blocks, thus it increased the turnover of the dock. Therefore, spatial scheduling for mega-block in an assembly yard becomes important...
Journal Articles
J Ship Prod Des 24 (01): 12–16.
Paper Number: SNAME-JSP-2008-24-1-12
Published: 01 February 2008
..., there are no software planning tools available to explicitly plan and schedule critical manufacturing space. The activity-based spatial scheduling tool described in this paper can be used by planners and construction management teams to easily reserve space within shipyard facilities for the construction and outfitting...
Journal Articles
J Ship Prod Des 23 (04): 197–201.
Paper Number: SNAME-JSP-2007-23-4-197
Published: 01 November 2007
..., it is difficult to accurately account for and plan its consumption with the current planning software tools available. The spatial scheduling tool described in this paper can be used by planners and construction management teams to manually or semiautomatically reserve space within the shipyard for construction...