1-20 of 26
Keywords: interim product
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
J Ship Prod Des 35 (03): 273–280.
Paper Number: SNAME-JSPD-2019-35-3-273
Published: 01 August 2019
...Damir Kolich; Sasa Sladic; Richard L. Storch The modern system of shipbuilding includes applying integrated hull construction, outfitting, and painting (IHOP) of ship interim products, as opposed to the traditional manner of first constructing the hull blocks, then performing basic outfitting...
Journal Articles
J Ship Prod Des 33 (04): 317–326.
Paper Number: SNAME-JSPD-2017-33-4-317
Published: 01 November 2017
...Damir Kolich; Richard L. Storch; Niksa Fafandjel The core competence of any medium-to-large sized shipyard includes the panel assembly line. Ship panels are the basic building blocks of well over 60% of the interim products of typical commercial ships. Therefore the improvement of the panel...
Journal Articles
J Ship Prod Des 27 (04): 186–193.
Paper Number: SNAME-JSPD-2011-27-4-186
Published: 01 November 2011
... schedule. In part, this is achieved by maintaining learning curve benefits at individual workstations, where similar but nonidentical interim products are produced. The changes to an existing design when employing mass customization can be estimated in design and production effort required to implement...
Journal Articles
J Ship Prod Des 20 (04): 221–231.
Paper Number: SNAME-JSP-2004-20-4-221
Published: 01 November 2004
... of Naval Architects and Marine Engineers IT software shipyard module information technology software dimension weld size productivity contingency planning product model database geometry work package interim product november 2004 kan ban Artificial Intelligence marine transportation...
Journal Articles
J Ship Prod Des 19 (01): 1–7.
Paper Number: SNAME-JSP-2003-19-1-1
Published: 01 February 2003
... process areas with positive results. This paper describes the pilot implementation project that was undertaken to establish an onblock and on-board design and construction process. This is a process by which interim product family components are competitively assembled and installed for new construction...
Journal Articles
J Ship Prod Des 19 (01): 53–63.
Paper Number: SNAME-JSP-2003-19-1-53
Published: 01 February 2003
... Construction, has adopted a template-based design process utiliz- ing standard ranges of parametric interim products. The aim of this improved design process as it applies to machinery space design as discussed in this paper must be to produce a complete infor- mational product on or before the specified due...
Journal Articles
J Ship Prod Des 18 (04): 195–202.
Paper Number: SNAME-JSP-2002-18-4-195
Published: 01 November 2002
... customization similarity interim product 1 11 2002 1 11 2002 2002. The Society of Naval Architects and Marine Engineers Development of Repeatable Interim Products Utilizing the Common Generic Block Concept Richard Lee Storch and Smith Sukapanpotharam University of Washington, Seattle...
Journal Articles
J Ship Prod Des 16 (03): 160–172.
Paper Number: SNAME-JSP-2000-16-3-160
Published: 01 August 2000
... as a Design for Production tool. marine transportation information computer model procedure shipbuilding policy interim product catalog shipyard model ship production Object-Oriented Architecture shipyard computer model physical property database diagram Artificial Intelligence designer...
Journal Articles
J Ship Prod Des 16 (01): 27–39.
Paper Number: SNAME-JSP-2000-16-1-27
Published: 01 February 2000
... shipbuilding policy information objective requirement designer Implementation interim product philosophy production process ship production integration design process evaluation configuration assembly method Journal of Ship Production, Vol. 16, No. 1, Feb. 2000, pp. 27-39 Design for Production...
Journal Articles
J Ship Prod Des 14 (02): 134–153.
Paper Number: SNAME-JSP-1998-14-2-134
Published: 01 May 1998
... procedure cad cam process shipyard productivity cg yard interim product cad cam Journal of Ship Production, Vol. 14, No. 2, May 1998, pp. 134-153 Paper presented at the 1997 Ship Production Symposium, April 21-23. 1997 New Orleans Hilton Hotel, New Orleans, Louisiana Implementation of Integrated...
Journal Articles
J Ship Prod Des 12 (03): 198–209.
Paper Number: SNAME-JSP-1996-12-3-198
Published: 01 August 1996
... information contract build strategy build strategy development interim product ship production shipbuilder Journal of Ship Production, Vol. 12, No. 3, Aug. 1996, pp. 198-209 Build Strategy Development J ohn C la rk 1 and Thomas Lamb 2 The 1985 NSRP Design for Production Manual describes the use...
Journal Articles
J Ship Prod Des 7 (04): 258–266.
Paper Number: SNAME-JSP-1991-7-4-258
Published: 01 November 1991
... shipbuilder designer marine transportation SCD procedure configuration interim product design deliverable november 1991 newport news sequence document construction Construction Yard Journal of Ship Production, Vol. 7, No. 4, Nov. 1991, pp. 258-266 SEAWOLF Producibility I1: Transition from...
Journal Articles
J Ship Prod Des 6 (02): 86–92.
Paper Number: SNAME-JSP-1990-6-2-86
Published: 01 May 1990
... practices, and discusses the versatility and significance of a product work breakdown approach. 1 5 1990 1 5 1990 1990. The Society of Naval Architects and Marine Engineers project management chirillo logic interim product traister gt logic naval shipyard marine transportation...
Journal Articles
J Ship Prod Des 5 (04): 249–255.
Paper Number: SNAME-JSP-1989-5-4-249
Published: 01 November 1989
...Jon Gribskov This paper describes the current Master Scheduling approach used at National Steel and Shipbuilding Company (NASSCO) in San Diego. Master schedules at NASSCO focus on key interim products involved in ship construction: units, blocks, (on-board) zones, and tests. Network scheduling...
Journal Articles
J Ship Prod Des 5 (03): 188–199.
Paper Number: SNAME-JSP-1989-5-3-188
Published: 01 August 1989
... Architects and Marine Engineers marine transportation Manufacturing Approach Implementation planning & scheduling Artificial Intelligence information operation quantity national shipbuilding research program nsrp model inventory management interim product shipyard productivity...
Journal Articles
J Ship Prod Des 5 (02): 115–125.
Paper Number: SNAME-JSP-1989-5-2-115
Published: 01 May 1989
... yard module shipbuilder shipbuilding construction drawing designer interim product producibility information database submarine design construction Journal of Ship Production, Vol. 5, No. 2, May 1989, pp. 115-125 Infusing Producibility into Advanced Submarine Design 1 B. R. Brucker 2...
Journal Articles
J Ship Prod Des 5 (02): 110–114.
Paper Number: SNAME-JSP-1989-5-2-110
Published: 01 May 1989
... "a decade before" the same logic revolution started in North American shipyards. 1 5 1989 1 5 1989 1989. The Society of Naval Architects and Marine Engineers information logic revolution ship production production engineering design phase naval architect interim product product...
Journal Articles
J Ship Prod Des 5 (01): 61–65.
Paper Number: SNAME-JSP-1989-5-1-61
Published: 01 February 1989
... information technology development shipbuilder construction work breakdown structure interim product ship Japan Merchant Marine contract design work flow shipbuilding 1989. The Society of Naval Architects and Marine Engineers 1 2 1989 1 2 1989 Journal of Ship Production, Vol...
Journal Articles
J Ship Prod Des 4 (03): 197–215.
Paper Number: SNAME-JSP-1988-4-3-197
Published: 01 August 1988
... products, that plan- ners gather better work content information based on pa- rameters, that schedulers develop and use "real time" effi- ciency rate information, that shop managers establish process lanes to produce similar interim products using standard processes, and that cost administrators gather...
Journal Articles
J Ship Prod Des 4 (03): 186–196.
Paper Number: SNAME-JSP-1988-4-3-186
Published: 01 August 1988
... to bear, it is essential to gain increased understanding of planning and fabrication processes, and to rationalize design, fabrication, and outfitting. The best roadmap for accomplishing this lies in zone design/ construction and the concept of the interim product. Following this roadmap will encourage...

Product(s) added to cart

Close Modal