Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Peer Reviewed
Format
Subjects
Journal
Date
Availability
1-20 of 158
Keywords: construction
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Journal Articles
J Ship Prod Des 38 (03): 172–181.
Paper Number: SNAME-JSPD-01220001
Published: 31 August 2022
... intelligence operation ground transportation metals & mining ship production month 2022 assembly work breakdown breakdown research international journal production efficiency workshop journal construction efficiency shipbuilding enterprise lean shipbuilding information shipbuilding...
Journal Articles
J Ship Prod Des 37 (02): 97–108.
Paper Number: SNAME-JSPD-11190059
Published: 10 May 2021
...John C. Daidola Modularity in the design and construction of naval vessels is considered wherein functional naval system-module installations that provide basic ship structure and ship interfaces are permanently integrated in an otherwise conventional ship envelope during construction...
Journal Articles
J Ship Prod Des 36 (02): 131–142.
Paper Number: SNAME-JSPD-2020-36-2-131
Published: 01 May 2020
... hull construction, outfitting, and painting execution system architecture for shipyard applications, developed following the component-based design methodology. The proposed systems key functions encompass stages from block assembly to hull outfitting at the quay, and enable visualization...
Journal Articles
J Ship Prod Des 35 (04): 309–316.
Paper Number: SNAME-JSPD-2019-35-4-309
Published: 01 November 2019
...Carlos Mascaraque-Ramírez; Lorena Para-González; Paloma Marco-Jornet In an increasingly globalized sector such as the naval construction sector, the search for reduction in execution terms and production costs becomes essential. With this aim, the vessel project should be analyzed globally...
Journal Articles
J Ship Prod Des 35 (03): 273–280.
Paper Number: SNAME-JSPD-2019-35-3-273
Published: 01 August 2019
...Damir Kolich; Sasa Sladic; Richard L. Storch The modern system of shipbuilding includes applying integrated hull construction, outfitting, and painting (IHOP) of ship interim products, as opposed to the traditional manner of first constructing the hull blocks, then performing basic outfitting...
Journal Articles
J Ship Prod Des 34 (02): 144–154.
Paper Number: SNAME-JSPD-2018-34-2-144
Published: 01 May 2018
...Paul W. Stott Commercial shipbuilding in the 21 st century is dominated by large suppliers, constructing series' of ships in highly efficient shipyards. The industry would be unrecognizable to shipbuilders from a century ago and this raises the question as to when the modern form developed. Much...
Journal Articles
J Ship Prod Des 34 (01): 9–19.
Paper Number: SNAME-JSPD-2018-34-1-9
Published: 01 February 2018
... liquified natural gas marine transportation inspection classification society requirement imperfection ship production welding process LNG butt weld checkpoint examination manufacturer Welding construction defect NDE Journal of Ship Production and Design, Vol. 34, No. 1, February 2018, pp...
Journal Articles
J Ship Prod Des 34 (01): 59–71.
Paper Number: SNAME-JSPD-2018-34-1-59
Published: 01 February 2018
..., and accommodation. Nevertheless, the amount of work performed abroad before the Norwegian yard takes over and continues production differs among various yards; some only offshore block construction, others construction of the entire hull. Yet others finish the ship to such a degree abroad that it does not need...
Journal Articles
J Ship Prod Des 33 (03): 237–246.
Paper Number: SNAME-JSPD-2017-33-3-237
Published: 01 August 2017
...Cristiano Fragassa A new design and construction procedure for manufacturing wooden boats is presented, based on modular, parameterized components produced by computer numerical control (CNC) machining. This semiautomated procedure greatly reduces time requirements for vessel assembly compared...
Journal Articles
J Ship Prod Des 33 (02): 144–155.
Paper Number: SNAME-JSPD-2017-33-2-144
Published: 01 May 2017
... in the global shipbuilding industry has been attracted by low labor costs in China. The Korean shipbuilding industry, with heavy industry as the central figure, is attempting to increase its share of offshore plant construction to develop deep-sea resources. This highlights the most outdated part of offshore...
Journal Articles
J Ship Prod Des 33 (01): 60–79.
Paper Number: SNAME-JSPD-2017-33-1-60
Published: 01 February 2017
... framework including systematic analysis for the index investigated through simulation and a simulation platform for constructing a smooth input/output environment by avoiding dependencies on existing solutions. The systemized simulation framework is expected to maximize the speed and precision of decision...
Journal Articles
J Ship Prod Des 32 (04): 245–257.
Paper Number: SNAME-JSPD-2016-32-4-245
Published: 01 November 2016
... merchant shipbuilding system based on the lean production methodology and the construction technology capability indices in the Shipbuilding Industry Standard Conditions. This article focuses more on the hull construction and merchant ship production processes, instead of the entire engineering...
Journal Articles
J Ship Prod Des 32 (02): 110–123.
Paper Number: SNAME-JSPD-2016-32-2-110
Published: 01 May 2016
... contributor to unnecessary work content growth later in Detail Design and Construction (DD&C) that cannot be eliminated no matter how productive the shipbuilder. However, new ship design methods are being developed and integrated with legacy physicsbased design and analysis tools into a Rapid Ship Design...
Journal Articles
J Ship Prod Des 29 (02): 49–56.
Paper Number: SNAME-JSPD-2013-29-2-49
Published: 01 May 2013
.... Structural stability and the no-skipped-blocks property are taken as constraints. The model is used to study the erection in three special cases. First, the case with a short lifting time is analyzed. Second, a solution is constructed for the case in which joining times are short and, third, the case...
Journal Articles
J Ship Prod Des 28 (02): 87–95.
Paper Number: SNAME-JSPD-2012-28-2-87
Published: 01 May 2012
...Kenneth W. Fisher The implementation of vessel designs is usually achieved through contracts for ship construction or conversion. Accordingly, the design process and the design organization's product have to anticipate and take into account the constraints and requirements of the contracts...
Journal Articles
J Ship Prod Des 27 (01): 14–25.
Paper Number: SNAME-JSPD-2011-27-1-14
Published: 01 February 2011
... of this builder during development of the new designs and the constructing of the barges to conform to the new OPA 90 Regulations. 1 2 2011 1 2 2011 2011. The Society of Naval Architects and Marine Engineers barge bulkhead stability marine transportation calculation shipyard inspection...
Journal Articles
J Ship Prod Des 26 (01): 66–75.
Paper Number: SNAME-JSPD-2010-26-1-66
Published: 01 February 2010
... factor contributing to increasing ship construction costs. Therefore, a strict detailed design review process was implemented for DDG 1000 that included improved computer-aided design tools and more efficient communication methods than previous ship detailed design efforts. The actual benefit...
Journal Articles
J Ship Prod Des 26 (01): 29–35.
Paper Number: SNAME-JSPD-2010-26-1-29
Published: 01 February 2010
... and associated curriculum have been designed as an integrated experience, and each one builds upon the knowledge gained during the previous activity. Marine Kit-1 is related to shipyard operations and provides a big picture of how a shipyard operates. Marine Kit-2 deals with cost estimation and construction...
Journal Articles
J Ship Prod Des 25 (04): 214–220.
Paper Number: SNAME-JSP-2009-25-4-214
Published: 01 November 2009
... construction corrosion prevention cost Journal of Ship Production, Vol. 25, No. 4, November 2009, pp. 214 220 An Estimate of the Market Potential for Corrosion Protection, Prevention, and Monitoring Systems in Ships Saurav Dhiman and Biplab Datta Vinod Gupta School of Management, IIT Kharagpur, India...
Journal Articles
J Ship Prod Des 25 (02): 88–94.
Paper Number: SNAME-JSP-2009-25-2-88
Published: 01 May 2009
... calculation type spot length spot requirement data structure product mix marine transportation shipyard investigation fraction restriction conversion capacity model layout requirement construction variance model Journal of Ship Production, Vol. 25, No. 2, May 2009, pp. 88 94 A Capacity...
1