Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Peer Reviewed
Format
Subjects
Journal
Date
Availability
1-5 of 5
Keywords: completion time
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
J Ship Prod Des 35 (02): 170–181.
Paper Number: SNAME-JSPD-2019-35-2-170
Published: 01 May 2019
... Architects and Marine Engineers evolutionary algorithm departure time moma optimal solution shipbuilding processing sequence completion time shop scheduling problem machine learning marine transportation makespan processing time Artificial Intelligence assembly line flow shop scheduling...
Journal Articles
J Ship Prod Des 27 (04): 186–193.
Paper Number: SNAME-JSPD-2011-27-4-186
Published: 01 November 2011
... transportation customer production process Artificial Intelligence triangular mass customization delivery schedule product variety Engineering simulation model assembly knowledge management ship production requirement interim product customization ship shipyard november 2011 completion time...
Journal Articles
J Ship Prod Des 24 (04): 214–220.
Paper Number: SNAME-JSP-2008-24-4-214
Published: 01 November 2008
... and about $9 million of construction material cost. The completion time for this kind of vessel ranges from 28 to 38 months. It would be possible to reduce the labor and material costs and completion time substantially with adequate and timely information of material re- quirements from the vendor through...
Journal Articles
A Computer Simulation Approach to Improving Tugboat Shipbuilding Design and Development Productivity
J Ship Prod Des 24 (04): 221–227.
Paper Number: SNAME-JSP-2008-24-4-221
Published: 01 November 2008
...Biman Das; Navin Tejpal Tugboat shipbuilding design drawings are currently prepared with insufficient and untimely information of material/equipment availability, resulting in drawing changes and errors, increased labor and material costs, and lengthening of ship completion time. It is proposed...
Journal Articles
J Ship Prod Des 23 (03): 142–146.
Paper Number: SNAME-JSP-2007-23-3-142
Published: 01 August 2007
... and in the resulting delivery period. These have been formalized using the fuzziness, and the reliability of the completion time has been calculated for the original process and the improved process. As a result, the proposed process that was calculated by the optimization program has been evaluated as having high...