1-9 of 9
Keywords: completion
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
J Ship Prod Des 31 (01): 58–62.
Paper Number: SNAME-JSPD-2015-31-1-58
Published: 01 February 2015
... the actual cost and the cost at completion of vessel drydockings based on the Gray system theory. Results show that the accuracy of the GM (1,1) forecasting model is highly efficient. 1 2 2015 1 2 2015 2015 Society of Naval Architects and Marine Engineers project management gray...
Journal Articles
J Ship Prod Des 26 (02): 155–162.
Paper Number: SNAME-JSPD-2010-26-2-155
Published: 01 May 2010
... the CONWIP concept to ship repair through the completion of a discrete event simulation. The research demonstrates that a CONWIP approach to ship repair can improve drydock turnover for large classes of ships requiring similar repairs, such as the US Coast Guards Mission Effectiveness Project. 1 5 2010...
Journal Articles
J Ship Prod Des 25 (02): 95–98.
Paper Number: SNAME-JSP-2009-25-2-95
Published: 01 May 2009
.... Dry docking can represent a considerable amount of time as they involve the inspection, overhaul, and, where necessary, the modification of existing equipment. Time and cost are two factors that, generally, play a significant role in the planning and controlling of dry docking. Faster completion...
Journal Articles
J Ship Prod Des 18 (03): 152–158.
Paper Number: SNAME-JSP-2002-18-3-152
Published: 01 August 2002
..., not only in terms of incremental improvements, but also in terms of changing the culture of an organization. This paper describes the process of conducting RIWs, discusses the tools employed, and gives case studies of their use in shipyards. shipbuilding completion Riw participant knowledge...
Journal Articles
J Ship Prod Des 7 (03): 183–187.
Paper Number: SNAME-JSP-1991-7-3-183
Published: 01 August 1991
... production. 1 8 1991 1 8 1991 1991. The Society of Naval Architects and Marine Engineers Computer System contract identification ship production intellectual property & technology law budget material control work package completion control system feedback loop planning...
Journal Articles
J Ship Prod Des 6 (02): 81–85.
Paper Number: SNAME-JSP-1990-6-2-81
Published: 01 May 1990
... groove, but with a greater standoff height to allow for the larger gap (Fig. 1).Fig. 1Pressure chamber assembly 1 5 1990 1 5 1990 1990. The Society of Naval Architects and Marine Engineers field data completion psig unevenness model testing environmental chamber new oval seal...
Journal Articles
J Ship Prod Des 6 (02): 101–124.
Paper Number: SNAME-JSP-1990-6-2-101
Published: 01 May 1990
... Intelligence completion requirement construction installation Journal of Ship Production, Vol. 6, No. 2, May 1990, pp. 101-124 First-Time Integration of Product by Stage of Construction with Cost/Schedule Control Application Matthew Reid I and John J. Dougher ty I There is nothing upon which...
Journal Articles
J Ship Prod Des 4 (03): 147–154.
Paper Number: SNAME-JSP-1988-4-3-147
Published: 01 August 1988
... government navy fleet oiler shipyard keel relative cost 1 contract manufacturing technology Avondale marine transportation completion footage construction program advanced shipbuilding technology ao-177 class tao 187 Implementation installation Journal of Ship Production, Vol. 4, No. 3, Aug...
Journal Articles
J Ship Prod Des 2 (02): 101–109.
Paper Number: SNAME-JSP-1986-2-2-101
Published: 01 May 1986
... project completion. The logic, procedure, and economy of the method are discussed with particular emphasis on the modular/zone concept of ship construction, which provides the basis for establishing the task block matrices. 1 5 1986 1 5 1986 1986. The Society of Naval Architects...

Product(s) added to cart

Close Modal