Tugboat shipbuilding design drawings are currently prepared with insufficient and untimely information of material/equipment availability, resulting in drawing changes and errors, increased labor and material costs, and lengthening of ship completion time. It is proposed that the design drawings are only prepared after confirmation of material/equipment availability from vendors to deal with the problem. The concept of concurrent engineering is introduced by integrating design and vendor activities through adequate and timely vendor-furnished information (VFI) to deal with the problem. The PERT (program evaluation and review technique) computer simulation models were employed through the use of a simulation package AweSim to analyze the work activity networks of piping drawings. A cost savings of about $1,389,700 would be possible through a 10% reduction in total design and including piping drawings and development labor costs and construction labor and material costs. The completion time for preparing design drawings and ship construction can be reduced by about 186 days or 19.5% of the total throughput time for a tugboat shipbuilding process.
Skip Nav Destination
Article navigation
November 2008
This article was originally published in
Journal of Ship Production
November 01 2008
A Computer Simulation Approach to Improving Tugboat Shipbuilding Design and Development Productivity
Navin Tejpal
Navin Tejpal
Alcoa Rexdale Packaging
Search for other works by this author on:
J Ship Prod 24 (04): 221–227.
Paper Number:
SNAME-JSP-2008-24-4-221
Article history
Published Online:
November 01 2008
Citation
Das, Biman, and Navin Tejpal. "A Computer Simulation Approach to Improving Tugboat Shipbuilding Design and Development Productivity." J Ship Prod 24 (2008): 221–227. doi: https://doi.org/10.5957/jsp.2008.24.4.221
Download citation file:
Sign in
Don't already have an account? Register
Personal Account
You could not be signed in. Please check your username and password and try again.
Could not validate captcha. Please try again.
Pay-Per-View Access
$35.00
Advertisement
3
Views
Cited By
Email Alerts
Advertisement
Suggested Reading
Major Factors Affecting Tugboat Ship Design and Construction
J Ship Prod (November,2008)
Toward Efficient Merchant Shipbuilding Based on the Lean Production Methodology
J Ship Prod Des (November,2016)
Development and Implementation of Modern Work Breakdown Structures in Naval Construction: A Case Study
J Ship Prod (August,1999)
Factors Affecting Ship Design and Construction Lead Time and Cost
J Ship Prod (August,2005)
A Digital Mock-up System for Construction of Product Information Model in Shipbuilding Process
J Ship Prod (February,2007)
Advertisement