This article is a synopsis of paper OTC 13256, "Installation of Subsea Trees in Roncador Field at 1800 m Water Depth Using the Drillpipe Riser," by J.R.F. Moreira, Petrobras, and T.E. Johansen, SPE, FMC-KOS, originally presented at the 2001 Offshore Technology Conference, Houston, 30 April-3 May.

This content is only available via PDF.
You can access this article if you purchase or spend a download.