Caprock-integrity issues have been brought to the forefront with recent documented steam and bitumen leaks making their way to the ground surface, forcing the Alberta Energy Regulator (AER) to place a moratorium on the licensing of shallow thermal in-situ oil-sand projects. Reviewing core-acquisition, -storage, -analysis, and -preservation techniques can prevent potential project failure, capital loss, environmental liabilities, and public-safety risks. Responsible development of thermal projects requires that caprock integrity be quantified.
This content is only available via PDF.
2015. Society of Petroleum Engineers
You can access this article if you purchase or spend a download.