1-9 of 9
Keywords: displacement
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the ISRM VietRock Conference, March 12–13, 2015
Paper Number: ISRM-VIETROCK-2015-025
... of serving roadway is less than 1/7, the roadway is designed to excavate through thin-bedded layered rocks [2]. coalbed methane conventional condition deflection Reservoir Characterization coal seam gas displacement coal bed methane Upstream Oil & Gas Hanoi rock stratification diagram...
Proceedings Papers

Paper presented at the ISRM VietRock Conference, March 12–13, 2015
Paper Number: ISRM-VIETROCK-2015-032
..., the measures for stabilizing the landslide are being carried out such as removing the weight of soil from the head of landslide, dewatering the cut slope and constructing the concrete shearpile wall, but it is difficult to stop completely the displacement of landslide. In order to early generate electricity...
Proceedings Papers

Paper presented at the ISRM VietRock Conference, March 12–13, 2015
Paper Number: ISRM-VIETROCK-2015-001
... monitoring successfully, various instruments and systems have been developed. The Global Positioning System (GPS) and Synthetic Aperture Radar (SAR) have the potential for application to displacement monitoring over an extensive area as attractive new monitoring tools in Rock Engineering. In this paper...
Proceedings Papers

Paper presented at the ISRM VietRock Conference, March 12–13, 2015
Paper Number: ISRM-VIETROCK-2015-013
... and performance of plug in the excavated openings (Fuenkajorn and Daemen, 1996; Akgun and Daemen, 1997; Tepnarong, 2012). casing and cementing cement plug cement grout shear stress cement property Upstream Oil & Gas specimen plug displacement push-out test cement formulation strength astm...
Proceedings Papers

Paper presented at the ISRM VietRock Conference, March 12–13, 2015
Paper Number: ISRM-VIETROCK-2015-023
... mm, and the maximum lateral displacement located at arc springing of tunnel with the value of 4.39 mm. The pre-settlement takes up to 25% of the final settlement, and has great implication when evaluating monitored data to gain reliable information about ground behavior. Tunnel crown settlement...
Proceedings Papers

Paper presented at the ISRM VietRock Conference, March 12–13, 2015
Paper Number: ISRM-VIETROCK-2015-015
... geotechnical applications. The performance of engineering structures constructed in rock is concerned with the presence of fractures in rock when subjected to forces and displacements (Curran and Leong, 1983; Li et al., 2012). In rock masses, properties such as roughness, separation and joint aperture have...
Proceedings Papers

Paper presented at the ISRM VietRock Conference, March 12–13, 2015
Paper Number: ISRM-VIETROCK-2015-048
..., the traditional area keeping letters, memorial Vietnamese and Soviet experts sacrifice to built hydropower projects. Along with the functions of social, economic, Hoa Binh hydroelectric becomes an exciting destination for visitors. displacement Hanoi Vietnam circular tunnel formula Viet Nam...
Proceedings Papers

Paper presented at the ISRM VietRock Conference, March 12–13, 2015
Paper Number: ISRM-VIETROCK-2015-010
... and polishing small specimens, the equipment as shown in Fig. 4 is used. Reservoir Characterization displacement Hanoi reservoir geomechanics isrm conference vietrock2015 conference vietrock2015 software Wellbore Design Singapore laboratory nanyang technological university precision Upstream...
Proceedings Papers

Paper presented at the ISRM VietRock Conference, March 12–13, 2015
Paper Number: ISRM-VIETROCK-2015-052
... be monitored and visualized on site in real time. The monitoring items can be listed as follows at normal construction site. ground transportation hanoi metro line 2 construction site displacement osv device rail transportation vertical bar application Upstream Oil & Gas low cost osv...

Product(s) added to cart

Close Modal