1-8 of 8
Keywords: risk management
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the ISRM SINOROCK 2013, June 18–20, 2013
Paper Number: ISRM-SINOROCK-2013-119
... level Design Optimization Upstream Oil & Gas max pressure evaluation risk management primary hole reduce max pressure absorption flow in porous media hydrogeological zone core recovery hydrogeological zoning permeability rock mass enhancement grout consumption maximum pressure grout...
Proceedings Papers

Paper presented at the ISRM SINOROCK 2013, June 18–20, 2013
Paper Number: ISRM-SINOROCK-2013-131
... the function of visualization of result at low cost, it makes possible to carry out monitoring in wider areas to improve the risk management practices. In this paper, a new sensor for monitoring ground deformation ahead of mountain tunneling face is introduced. The sensor consists of plastic optical fiber...
Proceedings Papers

Paper presented at the ISRM SINOROCK 2013, June 18–20, 2013
Paper Number: ISRM-SINOROCK-2013-146
... RISKS MITIGATION IN THE DESIGN PROCESS For some better design options, with available advanced methods /techniques, some risks can be mitigated in the design phase. 3.1 Geologic risks mitigation Many researches related to geologic risks management have been done, in which many methods are pro- posed...
Proceedings Papers

Paper presented at the ISRM SINOROCK 2013, June 18–20, 2013
Paper Number: ISRM-SINOROCK-2013-136
... normal operation risk level risk and uncertainty assessment law enforcement tunnel face microseismic activity tunnel excavation risk management Upstream Oil & Gas tunnel construction consequence rockburst probability hazard bearing body Reservoir Characterization risk assessment Risk...
Proceedings Papers

Paper presented at the ISRM International Symposium on Rock Mechanics - SINOROCK 2009, May 19–22, 2009
Paper Number: ISRM-SINOROCK-2009-189
... that has been performed. The risk management relies first upon a high level monitoring and an emergency plan; various mitigation strategies have been considered. 1 INTRODUCTION In 1980, rock falls including blocks of limited size occurred on the National Road RN 91, in the valley of the Romanche river...
Proceedings Papers

Paper presented at the ISRM International Symposium on Rock Mechanics - SINOROCK 2009, May 19–22, 2009
Paper Number: ISRM-SINOROCK-2009-174
... of construction methodology, as well as improper organization of the works, initiate collapses. How can we lower down these uncertainties to avoid or at least reduce collapses in tunnels in future? One effective way to do so is to understand and control these uncertainties. risk management risk...
Proceedings Papers

Paper presented at the ISRM International Symposium on Rock Mechanics - SINOROCK 2009, May 19–22, 2009
Paper Number: ISRM-SINOROCK-2009-200
... at portals requiring pre-support and heavy support; Tai Po potable water aqueduct - 12kms of TBM rock tunnel with steel liner, excavated at 700m depth in hard volcanic and granitic rocks with high water inflows. A state of the art Risk Management Plan and Matrix was employed for the first two...
Proceedings Papers

Paper presented at the ISRM International Symposium on Rock Mechanics - SINOROCK 2009, May 19–22, 2009
Paper Number: ISRM-SINOROCK-2009-157
... of the stockpiles and slopes were undertaken, providing a stability risk (potential for failure) and safety risk (consequences of failure) associated with the geotechnical characteristics at each location; The hazard associated with each feature was evaluated and classified as significant. risk...

Product(s) added to cart

Close Modal