1-1 of 1
Keywords: short stop
Close
Sort by
Proceedings Papers

Paper presented at the ISRM 9th Nordic Grouting Symposium, September 2–3, 2019
Paper Number: ISRM-NGS-2019-04
... evidence with data from THIGTs 3 work package 7 4 is presented where pressure connections between injection holes is shown to be lost after short stops in grouting. Indicating that the pressure distribution in the fracture is not uniform or always recoverable. A colloquial understanding for how...

Product(s) added to cart

Close Modal