Proceedings Papers

Paper presented at the ISRM International Symposium, November 19–24, 2000
Paper Number: ISRM-IS-2000-287
... × 300mm universal columns were also fixed at the middle of the frame. Close monitoring of the movement of the embankment was carried out in order to ensure that there is minimal settlement of the railway tracks. Monitoring were also carried out to detect movements of the existing bridge abutments...
Proceedings Papers

Paper presented at the ISRM International Symposium, November 19–24, 2000
Paper Number: ISRM-IS-2000-424
... remedial works, investigation of rainfall, surface and subsurface geological surveys and monitoring of the slope behavior were carried out. According to this investigation the remedial designs and works were performed. This paper describes the cause of the slope failure, the design and construction...
Proceedings Papers

Paper presented at the ISRM International Symposium, November 19–24, 2000
Paper Number: ISRM-IS-2000-593
... ABSTRACT: A case study is presented of the geotechnical design, construction and construction monitoring of the drained basement of the Airport Central Sheraton Hotel building at Mascot, Sydney. INTRODUCTION This paper provides brief details of the geotechnical design and construction...
Proceedings Papers

Paper presented at the ISRM International Symposium, November 19–24, 2000
Paper Number: ISRM-IS-2000-556
... ABSTRACT: It is considered necessary to undertake in-tunnel monitoring when new tunnels are constructed near to important existing tunnels. The records from monitoring on the Heathrow Express, in London, constructed by BAA between 1994 and 1996 have been examined with a view to seeking...
Proceedings Papers

Paper presented at the ISRM International Symposium, November 19–24, 2000
Paper Number: ISRM-IS-2000-592
...GEOTECHNICAL MEASUREMENTS FOR SAFETY ASSESSMENTS IN DIFFERENT DEVELOPMENT PHASES OF RADIOACTIVE WASTE REPOSITORIES IN SALT N. Diekmann 1, H. Schnier 1 and Th. Spies 1 ABSTRACT Geotechnical monitoring is an indispensable part of geoscientific investigation for all phases of the development...
Proceedings Papers

Paper presented at the ISRM International Symposium, November 19–24, 2000
Paper Number: ISRM-IS-2000-607
... Road interchange is constructed. Morell Bridge became one of the most monitored structures in Melbourne during the construction of the City Link Project. Initial review and analysis placed the bridge at significant risk from lateral movements during construction. The risk was highlighted...
Proceedings Papers

Paper presented at the ISRM International Symposium, November 19–24, 2000
Paper Number: ISRM-IS-2000-132
... ABSTRACT: Monitoring of the percolation through previously constructed capping layers at a former landfill at Bacton Road, Chandler was carried out to assess their performance under Brisbane climatic conditions. Comparisons of the field percolation with the results of modelling using...
Proceedings Papers

Paper presented at the ISRM International Symposium, September 10–12, 1990
Paper Number: ISRM-IS-1990-035
.... Upstream Oil & Gas borehole subsidence extensometer experiment knowledge management coal peak particle velocity Anchor case study extensometer hole strata stabilisation burial depth Drilling equation metals & mining blast hole hole 2 monitoring damage zone vibration Static...
Proceedings Papers

Paper presented at the ISRM International Symposium, May 26–28, 1982
Paper Number: ISRM-IS-1982-018
... SUMMARY: The report covers three aspects of hard rock mass mechanics with respect to large caverns, namely: orientation of cavern axes applying to massif parameters; evaluation of cavern mechanical system and their supporting elements; cavern wall state monitoring by means of measurement...
Proceedings Papers

Paper presented at the ISRM International Symposium, May 26–28, 1982
Paper Number: ISRM-IS-1982-005
... Upstream Oil & Gas cavern Reservoir Characterization geologic structure evaluation monitoring microseismic technique application microseismic activity signal conditioning cavern stability instability microseismic signal storage facility geophone transducer array transducer...
Proceedings Papers

Paper presented at the ISRM International Symposium, September 21–24, 1981
Paper Number: ISRM-IS-1981-224
... in the slide area were comprised of banded sandstones, banded shales and felspathic quartz- ite. The failure has occurred as a result of the undercutting of the underlying felspathic quartzite ore bearing horizon and the development of high water pressures within the slope. A simple monitoring programme...