Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-5 of 5
Keywords: cable
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
The Influence Of Roof Bolts Location On Its Interaction With The Rock Mass.
Available to Purchase
Paper presented at the ISRM International Symposium, November 19–24, 2000
Paper Number: ISRM-IS-2000-617
... numerical calculations were carried out. NUMERICAL CALCULATIONS Numerical modelling was realised utilising the explicit finite difference programme FLAC v.3.4 (Itasca, 1998). The cable element formulation in FLAC considers more than just the local effect of reinforcement, its effect in resisting formulation...
Proceedings Papers
Stability Studies of Pillars In the Realmonte Salt Mine
Available to Purchase
Paper presented at the ISRM International Symposium, September 10–12, 1990
Paper Number: ISRM-IS-1990-042
... reservoir geomechanics stability condition specimen vorkshop area strength programme investigation yorkshop area cable Reservoir Characterization displacement convergence MPa pillar deposit stabilization measure Upstream Oil & Gas Workshop Area layout pillar 4 stress...
Proceedings Papers
A Remotely Operated Borehole Deformation Gauge For Monitoring Stress Change In Rock
Available to Purchase
Paper presented at the ISRM International Symposium, August 31–September 3, 1986
Paper Number: ISRM-IS-1986-038
... the need to calibrate the device before and after installation and, in common with all strain gauge techniques, the data is obtained in the form of a very small analogue signal which must be transmitted by cable and is thus subject to electrical interference in a typical mining or construction environment...
Proceedings Papers
Rib-In-Roc Pre-Reinforcement System For Large Caverns
Available to Purchase
Paper presented at the ISRM International Symposium, May 26–28, 1982
Paper Number: ISRM-IS-1982-047
.... As the ribs are driven they are used as a site from which competent cable bolting can be carried out. As a rib is excavated, it is filled with reinforced concrete. Finally, after the proposed opening has been reinforced, the displacements are automatically controlled as the opening is being excavated. Using...
Proceedings Papers
Prestressed Pressure Tunnels And Surge Shafts - Active Post-Tensioned Concrete Linings
Available to Purchase
Paper presented at the ISRM International Symposium, May 26–28, 1982
Paper Number: ISRM-IS-1982-075
... circulaire cable construction surge shaft prestressed pressure tunnel revetement participation Upstream Oil & Gas Mise post-tensioned concrete lining active post-tensioned concrete lining galerie precontrainte realisation GALERIES FORCl~~ESPRECONTRAINTES ET CHAMBRES D'EQUILIBRE...