SUMMARY:

Design and construction aspects of the permanent underground features for a large hydroelectric pumped storage project are presented. All principal underground features are constructed in sedimentary rock formations consisting of thinly interbedded sandstone, siltstone, claystone and shale beds. In-situ testing results are summarized and results are related to design approach taken. Primary rock support system consists of shotcrete and pattern rockbolting. Concrete lining is provided throughout for hydraulic reasons and to assure permanent structural integrity of the conduit surfaces. Penstock bifurcations are located deep in the rock mass to simplify design and achieve economy. Steel-lined penstocks are designed accounting for rock assistance where the rock is sound. Drainage tunnels are provided to control external pressures on the penstocks. Tunnel and shaft excavation methods, rates of advance and rock bolt installation procedures are discussed.

ZUSAMMENFASSUNG:

Die Aspekte des Entwurfes und des Ausbaues der permanenten untertaqlqsn Bauwerke eines grossen hydroelektrischen Pumpspeicherwerkes sind dargestellt. Aile untertagigen Bauwerke sind in sedimentaren Felsformationen, bestehend aus duennen Wechsellschichtungen von Sandstein, verfestigten Schluffmergel, Tonstein und Schieferton, ausgebaut. Felsmechanische Untersuchungen sind zusammengefasst und die Resultate mit der Entwurfsweise in Beziehung gesetzt. Das Hauptsystem der Felsabstuetzung besteht aus Spritzbeton und Systemankerung des Felses. Durchgehende Betonauskleidung fuer hydraulische Zwecke und um andauernden Bestand der Ausbruchsflachen zu sichern ist vorgesehen. Zur Vereinfachung des Entwurfes und aus Okonomischen Grunden sind die Abzweigungen der Druckleitungen tief in dem Gebirge angeordnet. Der Entwurf der Stahlverkleidung der Druckleitungen beruecksicnttgt die Mitwirkung des Gebirges wo der Fels tragfahig ist. Dranage Stollen sind fuer die Kontrolle von Aussendruck auf die Stahlpanzerung der Druckstollen vorgesehen. Der Bauvorgang fur den Ausbruch, Vortriebsleistung und Verfahren fuer die Versetzung von Felsankern ist ertautert.

RESUME:

Les etudes et techniques de construction des installations souterraines pour une importante usine d''accurnutation d''energie par pompage hydraulique sont presentees. Toutes les installations principales sont construites dans la roche sedimentaire composee de couches entrecroisees de gres, silices, schistes, et argiles. Les resultats des essais in-situ sont resumes et compares aux etudes ettectuees, La methode principale de soutien de la roche consiste de beton projete et de boulons. Pour satisfaire aux conditions hydrauliques et assurer I''integrite structurale, unreveternent en beton est utilise sur toutes les surfaces. La culotte des conduites torcees est sttuee dans la masse rocheuse pour simplifier les etudes de construction et pour des raisons economiques. Les conduites torcees en acier sont con cues en tenant compte de la resistance de la roche. Des tunnels de drainage contrOlent les pressions externes sur les conduites forcees. Les methodes d''excavation de tunnel et des putts, les cadences de progression et les precedes d''instaltation de boulons sont traites.

INTRODUCTION

The Bath County Pumped Storage Project, located about 13 km north of Mountain Grove in northwestern Virginia, is presently under construction by the Virginia Electric and Power Company (VEPCO). When completed in 1986, it will have the world''s largest pumped storage installation of 2100 MW. Presently, the project is about 62 percent complete with almost all underground excavation fin- ished. Construction started in the spring of 1977 and continued on full-scale basis through May 1980 when, for economical reasons, all underground and fill construction was suspended. Full-scale activities resumed in the spring of 1982.

This discussion deals with the design and construction aspects of the project''s permanent underground features consisting of power tunnels with flow shafts, bifurcations, penstocks, surge shafts and penstock drainage tunnels to control groundwater effects.

(Figure in Full Paper)

BRIEF DESCRIPTION OF PROJECT GEOLOGY

All project underground features are situated in sedimentary rock formations of the Devonian age. The lower level features (Fig. 2, profile) are contained within the Millboro/Brallier formation which consists of thinly interbedded siltstone, sandstone and claystone. The medium hard, dense and thin-bedded siltstone is the predominant rock of the formation. Siliceously cemented, hard and rather thinly bedded sandstone, and the medium soft claystone form the interbeds of the formation.

This content is only available via PDF.
You can access this article if you purchase or spend a download.