An irrigation cum power scheme called Tehri Dam project is under construction across river Bhagirathi near the township of Tehri located about 80 km from Rishikesh. The greatest challenge to the designers is the construction of a huge cavern (250 m long, 50 m high and 22.5 m. wide to house the power plant for generating 2000 MW) especially, when adequate geological and geotechnical investigations could not be possible. An attempt has been made in the present paper to analyse the available data so that some guidelines could be prepared for the designers. Barton''s rock mass quality Q and Bieniawski''s rock mass rating RMR have been estimated for different catagories of rock masses likely to be encountered during the excavation of the cavern. Further, the values of deformation modulus estimated from RMR and diametrical tunnel-closure observations have been compared with those measured by flat jacks. A fair agreement between the measured and predicted parameters suggests that lack of adequate pre-construction geotechnical investigations could be compensated to some extent by judicious application of the available classification systems to generate some reasonably reliable design parameters.
Am Bhagirathi Fluss in der Nahe von Tehri, ca. 80 km von Rishikesh entfernt wird das Projekt "Tehri-Damm" zur Bewasserung und Stromversorgung, entwickelt. Die qrosst e Herausforderung an die Planer ist die Konstruktion einer grossen Kaverne (250 m lang, 50 m hoch und 22,5 m breit), die ein 2000 MW Kraftwerk beherbergen soll, insbesondere weil ausreichende geologische und geotechnische Untersuchungen nicht moögich waren. In der vorliegenden Arbeit wurde der Versuch unternommen, die vorhandenen Daten zu analysieren, so dass ein Leitfaden fuer die Planer vorbereitet werden konnte. Die Gebirgsqualitat Q nach Barton und die Gebirgsguete RMR nach Bienniawski wurden fuer verschiedene Gebirgskategorien, die wahrscheinlich beim Bau der Kaverne angetroffen werden, abgeschatzt. Weiterhin wurden die aus den RMR-Werten und aus Konvergenzmessungen abgeschatzten Werte fuer den Verformungsmodul mit denen aus Druckkissenversuchen verglichen. Eine gute Ubereinstimmung zwischen den gernessenen und vorhergesagten Parametern legt nahe, dass das Fehlen von geotechnischen Untersuchungen vor Baubeginn bis zu einem gewissen Grade durch eine sachgemasse Anwendung der vorhandenen Klassifikationssysteme zur Herleitung von vernunftigen und sicheren Entwurfsparametern kompensiert werden kann.
Le projet d'irriqation et d I'alimentation en courant, "Barrage Tehri", a ete execute sur Le fleuve Bhagirathi, non loin duquel est situe Tehri, a environ 80 km de Rishikesh. Le plus grand defi aux projeteurs constitue la construction d''une grande caverne (250 m de long, 50 m de haut et 22.5 m de large) devant loger une centrale electrique de 2000 MW, car il n''etait pas possible d''entreprendre des investigations geologiques et geotechniques suffisantes. Dans cette etude l''analyse des donnees existantes a ete tente, de telle sorte qu'' Un guide puisse etre prepare pour les projeteurs. La qualite du terrain Q, estimee selon Barton, sa qualite RMR, evaluee d''apres Bieniawski, ont ete determinees pour les diverses Categories de terrain qui probablement seraient rencontrees durant la construction de la caverne. De plus, les va leurs qui ont ete estimees a partir de la valeur-RMR et des mesures de convergence pour le module de deformation ont ete confrontees avec celles des essais de verin plat. Une bonne correspondance entre les parametres mesures et predits montre que l''absence d''investigations geologiques avant le debut de la construction peut etre, jusqu''a un certain degre, compensee par une utilisation appropriee des systemes de classification existants en vue d''en deduire pour la conception des parametres raisonnables et sûrs.
Tehri DamProject is an irrigation cum-power project near the township of Tehri about 80 km from Rishikesh. The project consists of a 260.5 m high earth and rock-fill dam across river Bhagirathi about 1.5 km downstream of its confluence with river Bhillangana, an underground power-house of 2000 MW installed capacity, a chute spillway to drain the excess discharge and four diversion tunnels (T1,T2, T3 and T4) each of 11.0 m finished diameter (Fig, 1). A portion of the two diversion tunnels (T1 and T2) will be used, as tail race tunnels.
The scheme of the tehri Dam Project was envisaged several decades ago. Its construction, however, could not be taken up earlier due to various reasons. One of the main reasons was inhospitable and inaccessible terrain Which precluded systematic preconstruction geo-technical investigations and would have created several impediments during the construction stage, The project has now been accorded top priority in view of the present oil crisis and improved communication on during the last decade.
The designers and the construction engineers were scaptical initially about the construction of such a huge underground structure on account of the following Questions:
What is the most rational and practical method for predicting the rock Loads and excavation conditions?