Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-3 of 3
Keywords: rehabilitation
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Paper presented at the ISRM International Symposium - EUROCK 2016, August 29–31, 2016
Paper Number: ISRM-EUROCK-2016-107
...Rock Mechanics and Rock Engineering: From the Past to the Future Ulusay et al. (Eds) © 2016 Taylor & Francis Group, London, ISBN 978-1-138-03265-1 Rehabilitation of a sliding slope and supporting measures for rock slopes in the abutments of the 130 m high Zapotillo dam in Mexico W. Wittke & B...
Proceedings Papers
Paper presented at the ISRM International Symposium - EUROCK 2010, June 15–18, 2010
Paper Number: ISRM-EUROCK-2010-184
... ABSTRACT: The paper addresses the foundation stability analysis of two Swiss dams, namely Spitallamm arch-gravity dam (in the scope of a rehabilitation and heightening project) and lesToules arch dam (rehabilitation). The first example is actually in the design phase, with construction...
Proceedings Papers
Paper presented at the ISRM International Symposium - EUROCK 2002, November 25–27, 2002
Paper Number: ISRM-EUROCK-2002-046
... into these structures. Due to needs related with the modernisation of railway ines and to ensure the safety and serviceability, the rehabilitation of these works has been under way. Therefore the observation of the works becomes essential. The inspections are an ~xtremely effective observation means. Actually...