Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Date
Availability
1-3 of 3
Keywords: rehabilitation
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Paper presented at the ISRM International Symposium - EUROCK 2016, August 29–31, 2016
Paper Number: ISRM-EUROCK-2016-107
... ranges between 2 and 15 MN/m 2 . They are also jointed (Fig. 5). abutment basin right abutment recent slide Reservoir Characterization rehabilitation high zapotillo dam right-hand side Mexico orientation measurement result upper left abutment excavation zapotillo dam stabilization...
Proceedings Papers
Paper presented at the ISRM International Symposium - EUROCK 2010, June 15–18, 2010
Paper Number: ISRM-EUROCK-2010-184
... ABSTRACT: The paper addresses the foundation stability analysis of two Swiss dams, namely Spitallamm arch-gravity dam (in the scope of a rehabilitation and heightening project) and lesToules arch dam (rehabilitation). The first example is actually in the design phase, with construction...
Proceedings Papers
Paper presented at the ISRM International Symposium - EUROCK 2002, November 25–27, 2002
Paper Number: ISRM-EUROCK-2002-046
... and, sometimes, due to the large amount of water flowing into these structures. Due to needs related with the modernisation of railway lines and to ensure the safety and serviceability, the rehabilitation of these works has been under way. Therefore the observation of the works becomes essential. The inspections...