Proceedings Papers

Paper presented at the ISRM Regional Symposium - EUROCK 2015, October 7–10, 2015
Paper Number: ISRM-EUROCK-2015-013
... the traffic and to enable the construction works at the same time. The ground conditions with the presence of mineral water have a major impact on the tunnel construction works. As the project is partly located in an area, in which dewatering of groundwater is not allowed, restrictions of the tunneling...
Proceedings Papers

Paper presented at the ISRM Regional Symposium - EUROCK 2015, October 7–10, 2015
Paper Number: ISRM-EUROCK-2015-006
... difference in altitude of 1,320 m, largest distance from the ground 286 m, and an enormously long free-hanging span of 1,548 km between the valley station and pillar 1 (Untersbergbahn 2015). interruption construction work cable car ground transportation long time monitoring Anchor construction...
Proceedings Papers

Paper presented at the ISRM Regional Symposium - EUROCK 2015, October 7–10, 2015
Paper Number: ISRM-EUROCK-2015-016
... Abstract The Arlberg Road Tunnel with a length of almost 14 kilometres is both, the longest road tunnel in Austria as well as the most important east to west connection between Tyrol and Vorarlberg. While construction works started in 1974, the tunnel with a project volume of about 4 billion...
Proceedings Papers

Paper presented at the ISRM Regional Symposium - EUROCK 2015, October 7–10, 2015
Paper Number: ISRM-EUROCK-2015-059
... deviation construction work Upstream Oil & Gas site facility area failure mechanism geotechnical safety management fröschnitzgraben inclinometer support measure construction actual system behavior ABSTRACT: The site facility area Fröschnitzgraben of the SBT2.1 section of the Semmering...
Proceedings Papers

Paper presented at the ISRM International Symposium - EUROCK 2013, October 23–26, 2013
Paper Number: ISRM-EUROCK-2013-140
.... After a first introduction focused on the project general description, the paper will present the intensive geomechanical in situ and laboratory tests. Due to the necessity of ensuring coexistence between the construction works and the existing cableway serviceability (at least for the main part...
Proceedings Papers

Paper presented at the ISRM International Symposium - EUROCK 2002, November 25–27, 2002
Paper Number: ISRM-EUROCK-2002-071
... geomechanics rock massif stress state Anchor machine hall Reservoir Characterization crane rail sandstone construction work elevation massif construction aleurolite renewable energy transformer bay stability excavation underground machine hall deformation THE STABILITY OF THE ROGUN...