Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-4 of 4
Keywords: construction cost
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Paper presented at the ISRM International Symposium - 10th Asian Rock Mechanics Symposium, October 29–November 3, 2018
Paper Number: ISRM-ARMS10-2018-221
... of a cavity wide enough to host a standard nuclear reactor. Abandoned when Norway banned the use of nuclear energy, the project was revived at the opportunity of Winter Olympics 1994 and built successfully. Construction Cost : High capital cost is a widespread concern for any new NPP. Consequently...
Proceedings Papers
Paper presented at the ISRM Regional Symposium - 7th Asian Rock Mechanics Symposium, October 15–19, 2012
Paper Number: ISRM-ARMS7-2012-004
... by preventing oil supply disruption and providing price flexibility. Moreover, the unit cost of underground storage construction is approximately 13 dollars per barrel, and thus the construction cost can be retrieved through several flexible responses to oil price fluctuations. Figure 1. Growth of petroleum...
Proceedings Papers
Paper presented at the ISRM International Symposium - 2nd Asian Rock Mechanics Symposium, September 11–14, 2001
Paper Number: ISRM-ARMS2-2001-003
... dimension is 15m × 20m with the total length of 1,262m. The construction was started in 1975 and was completed III 1982. natural gas storage underground space Seoul rail transportation Downstream Oil & Gas cavern subway construction ground transportation construction cost Korea...
Proceedings Papers
Paper presented at the ISRM International Symposium - 2nd Asian Rock Mechanics Symposium, September 11–14, 2001
Paper Number: ISRM-ARMS2-2001-096
... Table 4. Comparison between construction costs with different slope ratio Item Earth volume Earth volume filled Length of the tunnel Construction COSIexcavated (1111/01) under lake (ten thousandRatio of slope (m'/m) (km ) Yuan) I: 1.50 762.52 482.53 1 785 980208 I: 1.75 794.02 514.03 1 785 11612.53 1...